LCVR_2-5-A BROYCE | Alldatasheet
Document overview
- Manufacturer or author: Provided By alldatasheet.com(free datasheet download site)
- PDF pages: 1
Technical content
Broyce Control Ltd., Pool Street, Wolverhampton, West Midlands WV2 4HN. England Tel: +44 (0) 1902 773746 Fax: +44 (0) 1902 420639 Email: sales@broycecontrol.com Web: www.broycecontrol.com The Information provided in this literature is believed to be accurate (subject to change without prior notice); however, use of such information shall be entirely at the user’s own risk. LCVR_2-5-A 2507 XXXXX HS Code: 85364900 Country of Origin: UK Dims: to DIN 43880 W. 17.5mm INSTALLATION AND SETTING
- BEFORE INSTALLATION, ISOLATE THE SUPPLY.
- Connect the unit as required. The Connection Diagram below shows a typical installation, whereby the supply to a load is being monitored by the Voltage monitoring relay. If a fault should occur (i.e. fuse blowing), the relay will de-energise and assuming control of the external Contactor, de-energise the Contactor as well. Applying power.
- Set the “Nominal (Un)” ➍ voltage selector to match that of the voltage being monitored.
- Set the Over %” ➎ adjustment to maximum and the “Under %” ➐ adjustment to minimum. Set the “Delay (t)” ➏ to minimum.
- Apply power and the green “Power supply” ➊ LED will illuminate. Both the red “RLY1” ➋/“RLY2” ➌ LED’s will illuminate and corresponding RLY1 and RLY2 relays energise after the short Power on delay (Td).
- Refer to the Troubleshooting table if the unit fails to operate correctly. Setting the unit (with power applied).
- Set the “Over %” and the “Under %” adjustments to give the required monitoring range.
- If large supply variations are anticipated, the adjustments should be set further from the nominal voltage.
- Set the “Delay (t)” adjustment as required. (Note that the delay is only effective should the supply increase above or drop below the set trip levels. However, if during an under voltage condition the supply drops below the 2 nd under voltage trip level, any set time delay is automatically cancelled and both relays de-energise immediately). Troubleshooting. The table below shows the status of the unit during a particular fault condition. Supply fault Green LED Red LED Red LED ➌ Relay RLY1 Relay RLY2 Under voltage condition (during timing) On On Flash ing Energised En for delay (t) Under voltage condition (after timing) On Off Off E nergised De-energised Over voltage condition (during timing) On Flashing On En for delay (t) Energised Over voltage condition (after timing) On Off On De- energised Energised Supply < fixed under trip level [2] On Off Off De-e nergised De-energised TECHNICAL SPECIFICATION Supply/monitoring voltage Un (A1, A2): LCVR /2 (LV) * 110, 115 V AC LCVR/2 (HV)* 220, 230, 240V AC Frequency range: 48 – 63Hz Supply variation: LV: 70 – 150V HV: 140 – 315V AC Overvoltage category: III (IEC 60664) Rated impulse withstand voltage: 4kV (1.2/50 µ S) IEC 60664 Power consumption (max.): 2.5VA Monitoring mode: Under and Over voltage Trip levels: Under [2]: Fixed ± 2% see below Under: 75 – 95% of Un Over: 105 – 125% of Un Measuring ranges: Nominal (Un) Under [2] Under Over LCVR/2 (L V) 110V 70 V 83 – 105 V 116 – 138 V 115V 74V 156 – 198V 218 – 260V LCVR/2 (HV) 220V 140V 165 – 209V 231 – 275V 230V 147V 173 – 219V 242 – 288V 240V 153V 180 – 228V 252 – 300V Hysteresis: ≈ 2% of trip level (factory set) Setting accuracy: ± 3% Repeat accuracy: ± 0.5% at constant conditions Immunity from micro power cuts: <50ms Response time: ≈ 50ms Time delay (t): 0.2 – 10s (± 5%) Note: actual delay (t) = adjustable delay + response time Power on delay (Td): ≈ 1s (worst case = Td x 2) Reset time: 50 – 100ms Power on indication: Green LED Relay status indication: Red LED x2 Ambient temperature: -20 to +60 °C Relative humidity: +95% max. Output (15, 16, 18 / 25, 26, 28) : 2 x SPDT relay Output rating: AC1 250V 5A (1250VA) AC15 250V 2A DC1 25V 5A (1 25W) Electrical life: ≥ 150,000 ops at rated load Dielectric voltage: 2kV AC (rms) IEC 60947-1 Rated impulse withstand voltage: 4kV (1.2/50 µ S) IEC 60664 Housing: Grey flame retardant UL94 Weight: 90g Mounting option: On to 35mm symmetric DIN rail to BS EN 60715 or direct surface mounting via 2 x M3.5 or 4BA screws using the black clips provided on the rear of the unit. Terminal conductor size: ≤ 2.5mm 2 solid or stranded Terminal screw: M3 Tightening torque: 0.4Nm (3.5Lb-In) Max. Approvals: Conforms to IEC. CE, UKCA, and RoHS Compliant. EMC: Immunity: EN 61000-6-2 Emissions: EN 61000-6-4 FUNCTION DIAGRAM Under and Over Voltage Monitoring Terminal Protection to IP20 DIMENSIONS Withdraw clips fully when surface mounting 92 (+/- 1mm) 67.5 49.5 66.5 89 (exc. clips) Insert screwdriver to release clips all dimensions in mm. Compact 17.5mm DIN rail housing Microprocessor based True R.M.S. monitoring Selectable nominal voltages to suit most popular single phase supply voltages Monitors own supply and detects if the set Under or Over voltage trip levels are exceeded Adjustments for Under and Over voltage trip levels Adjustment for Time delay Independent relay outputs - Under voltage monitoring (RLY2) / Over voltage monitoring (RLY1) 2 x SPDT relay output 5A Green LED indication for supply status Individual Red LED indication for both relay statuses SETTING DETAILS Above example showing L CVR /2 (HV) 1. Power supply status (Green) LED 2. Relay output / Timing status (Red) LED for Over voltage tripping 3. Relay output / Timing status (Red) LED for Under voltage tripping 4. “Nominal (Un)” voltage selector 5. “Over %” trip level adjustment^ 6. “Delay (t)” adjustment 7. Under %” trip level adjustment^ ^scaled as % of the selected nominal voltage “Un” CONNECTION DIAGRAM ➍ ➊ * Please state model variant when ordering Type: L CVR /2 Under and Over Voltage plus Time Delay