DATASHEET SEARCH SITE | WWW.ALLDATASHEET.COM

Document overview

  • Manufacturer or author: Provided By ALLDATASHEET.COM(FREE DATASHEET DOWNLOAD SITE)
  • PDF pages: 4

Technical content

For Technical Support: www.panduit.com/resources/install_maintain.asp INSTALLATION INSTRUCTIONS © Panduit Corp. 2014 PN375C Page 1 of 4 TX6 PLUS Shielded Modular Plug T568B & T568A Part Number: SPS688-C  Thread boot and collar onto cable.  Remove 1.5" of the outer jacket using wire stripping tool (CJAST).  Cut foil flush with cable jacket. If cable is braided, form braid into a drain wire. Bend the drain wire back so it is against the cable jacket.  Fan twisted pairs into respec tive quadrants. The brown pair should be opposite the orange pair.  Cut spline flush to fanned pairs using wire snipping tool (CWST).

1 Thread on boot

and collar first! (Cable ends 1 & 2) 90° CWST Specifications  Cable jacket diameter 0.225-0.250 in.  24 AWG solid or stranded conductor maximum insulated diameter 0.040 in.  Panduit recommends T568B wiring scheme for use with cable constructed with the brown pair opposing the orange pair.  For use with FTP , ScTP , SFTP and STP/PIMF type cables. Cable must have drain wire or braid. Conductor holes and contact slots Strain relief boot Strain relief collar Divider Load bar Plug housing with shield Load Bar 1 8 Divider Conductor slots and “V” channel  Align the conductor divider “V” channel with the green pair.  Insert divider posts into the cable. If the cable has an internal spline, insert divider posts into the brown and orange quadrants of the spline. BLU GRN “V” channel BRN ORG GRN BLU BRN ORG (Cable end 2) (Cable end 1) “V” channel Drain wire Drain wire  Arrange conductors to T568B wiring scheme while minimizing untwist.  Seat conductors into proper divider slots while holding divider flush with cable jacket. “V” channel (Cable end 1) (Cable end 2) T568B Wiring Scheme T568B BRN WHT BRN/ GRN WHT BLU/ BLU WHT GRN/ ORG WHT ORG/ Pin #(Cable end 2) (Cable end 1) “V” channel Conductor holes Contact slots Divider post Pins

For Technical Support: www.panduit.com/resources/install_maintain.asp INSTALLATION INSTRUCTIONS © Panduit Corp. 2014 PN375C Page 2 of 4  Guide conductors into load bar holes while holding conductors in the divider.  Slide load bar towards divider until flush.  Ensure the divider/load bar is centered and perpendicular to the cable axis.  Trim conductors flush with load bar face. (Cable end 1)  Orient load bar with contact slots facing downward. Verify load bar orientation (Cable end 1) (Cable end 2) 8Pins 8Pins  Straighten and align untwisted conductors using a circular motion while holding conductors in respective divider slots.  Maintain grip of conductors in T568B wiring scheme.  Trim conductors on an angl e approximately 1.00" from divider leading edge. 1.00" T568B BRN WHT BRN/ GRN WHT BLU/ BLU WHT GRN/ ORG WHT ORG/ Pin # (Cable end 1) MPT5-8AS Plug housing  Grip the strain relief collar and insert cable sub-assembly into the plug housing. (Fig. 9)  Push sub-assembly into housing until collar locking tabs engage the plug housing pocket. Although not required, TX6 PLUS Plug Assembly Tool (CSPT) is available to facilitate this step.  Use tool MPT5-8AS to complete plug termination. (Fig. 10)  Trim or press excess drain wire between the collar latches.  Push up boot and engage with collar latches.  Visually check plug. Assembly is complete. Drain wire (Cable end 2) (Cable end 1) Strain collar guides Collar latches Boot position when using CSPTPins Collar barbs Pins Collar locking tabs  Orient cable so the drain wire is facing up.  Hold the load bar and divider stationary while sliding the strain relief collar forward until there is no gap between the collar and divider.  Ensure the drain wire is rout ed through the strain collar guides.  Confirm the cable jacket extends beyond the collar barbs.  Align pin #1 of cable sub-assembly (cable, load bar, divider, and strain relief collar) with pin #1 of plug housing.

For Technical Support: www.panduit.com/resources/install_maintain.asp INSTALLATION INSTRUCTIONS © Panduit Corp. 2014 PN375C Page 3 of 4 T568A Wiring Scheme T568A BRN WHT BRN/ ORG WHT BLU/ BLU WHT ORG/ GRN WHT GRN/ Pin #  The “V” channel should be aligned with the orange pair.  Insert divider posts into the cable. If the cable has an internal spline, insert divider posts into the brown and green quadrants of the spline. BLU ORG “V” channel BRN GRN ORG BLU BRN GRN (Cable end 2) (Cable end 1) “V” channel Drain wire Drain wire  Arrange conductors to T568A wiring scheme while minimizing untwist.  Seat conductors into proper divider slots while holding divider flush with cable jacket. “V” channel (Cable end 1) (Cable end 2) Conductor holes and contact slots Load Bar Divider Conductor slots and “V” channel “V” channel Divider post 1 8 Conductor holes Contact slots Pins Specifications  Cable jacket diameter 0.225 - 0.250 in.  24 AWG solid or stranded conductor maximum insulated diameter 0.040 in.  Panduit recommends T5 68A wiring scheme for use with cable constructed with the brown pair opposing the green pair.  For use with FTP , ScTP , SFTP and STP/PIMF type cables. Cable must have drain wire or braid. Strain relief boot Strain relief collar Divider Load bar Plug housing with shield (Cable end 2) (Cable end 1)  Thread boot and collar onto cable.  Remove 1.5" of the outer jacket from the cable end using wire stripping tool (CJAST).  Cut foil flush with cable jacket end. If cable is braided, form into a drain wire. Bend the drain wire back so it is against the cable jacket.  Fan twisted pairs into respec tive quadrants. The brown pair should be opposite the green pair.  When a cable spline (X-shaped filler) is present, cut spline flush to fanned pairs using wire snipping tool (CWST). and collar first! (Cable ends 1 & 2) 90° CWST

INSTALLATION INSTRUCTIONS © Panduit Corp. 2014 PN375C E-mail: techsupport@panduit.com Phone: 866-405-6654 For Instructions in Local Languages and Technical Support: Page 4 of 4 1.00" T568A BRN WHT BRN/ ORG WHT BLU/ BLU WHT ORG/ GRN WHT GRN/ Pin # (Cable end 1)  Straighten and align untwisted conductors using a circular motion while holding conductors in respective divider slots.  Maintain grip of conductors in T568A wiring scheme.  Trim conductors on an angle approximately 1.00" from divider leading edge.5 (Cable end 1) (Cable end 2) 8Pins Verify load bar orientation 8Pins  Orient load bar with contact slots facing downward. (Cable end 1) 7  Guide conductors into load bar holes while holding conductors in the divider.  Slide load bar towards divider until flush.  Ensure the divider/load bar is centered and perpendicular to the cable axis.  Trim conductors flush with load bar face. MPT5-8AS housing Plug  Grip the strain relief collar and insert cable sub-assembly into the plug housing. (Fig. 9)  Push sub-assembly into housing until collar locking tabs engage the plug housing pocket. Although not required, TX6 PLUS Plug Assembly Tool (CSPT) is available to facilitate this step.  Use tool MPT5-8AS to complete plug termination. (Fig. 10)  Trim or press excess drain wire between the collar latches.  Push up boot and engage with collar latches.  Visually check plug. Assembly is complete. Drain wire (Cable end 2) (Cable end 1) Strain collar guides Collar latches Boot position when using CSPTPins Collar barbs Pins Collar locking tabs gp  Hold the load bar and divider stationary while sliding the strain relief collar forward until there is no gap between the collar and divider.  Ensure the drain wire is rout ed through the strain collar guides.  Confirm the cable jacket extends beyond the collar barbs.  Align pin #1 of cable sub-assembly (cable, load bar, divider, and strain relief collar) with pin #1 of plug housing.