03S121-272S3 ROSENBERGER | Alldatasheet

Document overview

  • Manufacturer or author: Provided By ALLDATASHEET.COM(FREE DATASHEET DOWNLOAD SITE)
  • PDF pages: 2

Technical content

RPC83.50 STRAIGHT PLUG 03S121-272S3 Rosenberger Hochfrequenztechnik GmbH & Co. KG Tel.: +49 8684 1880 Page P.O.Box 1260 D884526 Tittmoning Germany Fa x: +49 8684 188499 www.rosenberger.de email: info@rosenberger.de 1 / 2 RF_35/12.04/3.0 All dimensions are in mm; tolerances according to ISO 2768 m8H Interface According to IEC 60169823 Mechanically compatible with RPC82.92 and SMA Documents Assembly instruction 03 A Material and plating Connector parts Material Plating Center contact Beryllium copper Gold, min. 1.27 µm , over chemical nickel Outer contact Stainless steel Passivated Coupling nut Stainless steel Passivated Dielectric PS Gasket Silicone Solder sleeve Brass Gold, 0.1 µm min.

RPC83.50 STRAIGHT PLUG 03S121-272S3 Rosenberger Hochfrequenztechnik GmbH & Co. KG Tel.: +49 8684 1880 Page P.O.Box 1260 D884526 Tittmoning Germany Fa x: +49 8684 188499 www.rosenberger.de email: info@rosenberger.de 2 / 2 RF_35/12.04/3.0 f(GHz) Electrical data Impedance 50 Ω Frequency DC to 26.5 GHz Return loss ≥ 25 dB, DC to 26.5 GHz Insertion loss ≤ 0.03 x dB Insulation resistance ≥ 5 G Ω Center contact resistance ≤ 3.0 m Ω Outer contact resistance ≤ 2.0 m Ω Test voltage 1000 V rms Working voltage 335 V rms RF8leakage ≥ 100 dB up to 1 GHz

8 Limitations are possible due to the used cable type 8

Mating cycles ≥ 500 Center contact captivation ≥ 27 N Coupling test torque 1.70 Nm Recommended torque 0.80 Nm to 1.10 Nm Environmental data Temperature range 840°C to +85°C Thermal shock MIL8STD8202, Method 107, Condition B Corrosion MIL8STD8202, Method 101, Condition B Vibration MIL8STD8202, Method 204, Condition D Shock MIL8STD8202, Method 213, Condition I Moisture resistance MIL8STD8202, Method 106 2002/95/EC (RoHS) compliant Tooling N/A Suitable cables UT 141 / RTK8FS 141 / RTK8Flex 402 Packing Standard 1 pce in bag Weight 13.4 g/pce Draft Date Approved Date Rev. Engineering change n umber Name Date Herbert Babinger 05/05/04 M. Moder 28/03/12 c00 12 -0205 Maik Knoll 28/03/12 While the information has been carefully compiled to the best of our knowledge, nothing is intended as representation or warranty on our part and no statement herei n shall be construed as recommendation to infringe existing patents. In the effort to improve our products, we reserve the right to make changes judged to be necessary.