BTS05-2A46 MEDER | Alldatasheet
Document overview
- Manufacturer or author: Provided By ALLDATASHEET.COM(FREE DATASHEET DOWNLOAD SITE)
- PDF pages: 2
Technical content
Item:| Email: salesasia@meder.com 8805246800 +852 / 2955 1682Asia: | Email: salesusa@meder.com+1 / 508 295 0771USA: Item No.:| Email: info@meder.com+49 / 7731 8399 0Europe: Reed Relay Coil Data at 20 °C Conditions Min Typ Max Unit Coil resistance Coil voltage Rated power Pull-In voltage Drop-Out voltage Contact data 46 Conditions Min Typ Max Unit !"" not to exceed their individual max.'sContact rating DC or Peak ACSwitching voltage #DC or Peak ACSwitching current #DC or Peak ACCarry current $!" % " " Start ValueContact resistance static &'RH <45 %, 100 V test voltageInsulation resistance according to IEC 255-5Breakdown voltage measured with 40% overdriveOperate time incl. bounce measured with no coil excitationRelease time ()@ 10 kHz across open switchCapacity Special Product Data Conditions Min Typ Max Unit 2Number of contacts * Thermal Offset Voltage according to EN 60255-5Dielectric Strength Coil/Contact MetalHousing material PolyurethanSealing compound cu-alloy tinnedConnection pins yesRoHS conformity Environmental data Conditions Min Typ Max Unit Modifications in the sense of technical progress are reserved
23.06.08 WKOVACS
CRUF 06Version: Designed by: Last Change at: Designed at: Last Change by:19.09.11 CRUF KOLBRICHApproval by: Approval by: 21.10.08 Approval at: 19.09.11 Approval at:
Item:| Email: salesasia@meder.com 8805246800 +852 / 2955 1682Asia: | Email: salesusa@meder.com+1 / 508 295 0771USA: Item No.:| Email: info@meder.com+49 / 7731 8399 0Europe: Typ Max UnitMinConditionsEnvironmental data 1/2 sine wave duration 11msShock from 10 - 2000 HzVibration -Operating temperature -Storage temperature .wave soldering max. 5 sec.Soldering temperature fully sealedWashability General data Conditions Min Typ Max Unit Packaging Modifications in the sense of technical progress are reserved CRUF 06Version: Designed by: Last Change at: Designed at: Last Change by:19.09.11 CRUF KOLBRICHApproval by: Approval by: 21.10.08 Approval at: 19.09.11 Approval at: