750 ARISTA | Alldatasheet
Document overview
- Manufacturer or author: Provided By alldatasheet.com(free datasheet download site)
- PDF pages: 63
Technical content
Datasheet sections
- 1.1 Scope
- 1.2 Receiving and Inspecting the Equipment
- 1.3 Installation Process
- 1.4 Safety Information
- 1.5 Obtaining Technical Assistance
- 1.6 Specifications
- 2.1 Site Selection
- 2.2 Tools and Parts Required for Installation
- 2.3 Electrostatic Discharge (ESD) Precautions
- 3.1 Two-post Rack Mount
- 3.1.1 Rack Mounting the CCS-755 for Two-post
- 3.1.2 Rack Mounting the CCS-758 for Two-post
- 3.2 Four-post Rack Mount (Optional)
- 3.2.1 Rack Mounting the CCS-755 for Four-post
- 3.2.2 Rack Mounting the CCS-758 for Four-post
- 4.1 Cabling the Power Supplies
- 4.2 Cabling Chassis Ground
- 4.3 Cabling the AC Power Supplies
- 4.4 Power Supply Specifications
- 4.5 Power Supply Configurations
- 4.5.1 Recommendations for Power Supply Usage
- 4.6 Power Supply Redundancy
- 4.7 Connecting Supervisor Cables
- 4.8 Connecting Linecard Modules and Cables
750 Series
Arista.com Arista Networks DOC-04730-03
Headquarters Support Sales
5453 Great America Parkway
Santa Clara, CA 95054 USA +1-866-476-0000 +1-408-547-5501 +1-866-497-0000 www.arista.com/en/ support@arista.com sales@arista.com © Copyright 2024 Arista Networks, Inc. All rights reserved. The information contained herein is subject to change without notice. The trademarks, logos, and service marks ("Marks") displayed in this documentation are the property of Arista Networks in the United States and other countries. Use of the Marks is subject to the Arista Networks Terms of Use Policy, available at www.arista.com/en/terms-of-use. Use of marks belonging to other parties is for informational purposes only.
The following topics are covered in this section:
- Scope
- Receiving and Inspecting the Equipment
- Installation Process
- Safety Information
- Obtaining Technical Assistance
- Specifications
1.1 Scope
This guide is intended for properly trained service personnel and technicians who need to install the following Arista Networks Data Center Switches.
- CCS-755
- CCS-758 Important: Only qualified personnel should install, service, or replace this equipment. Seul le personnel qualifié doit installer, service, ou remplacer cet équipement.
1.2 Receiving and Inspecting the Equipment
Upon receiving the switch, inspect the shipping boxes and record any external damage. Retain packing materials if you suspect that part of the shipment is damaged; the carrier may need to inspect them. If the boxes were not damaged in transit, unpack them carefully. Ensure that you do not discard any accessories that may be packaged in the same box as the main unit. Inspect the packing list and confirm that you received all listed items. Compare the packing list with your 750 Series Modular Switches purchase order. Parts List provides a list of components included with the switch.
1.3 Installation Process
The following tasks are required to install and use the switch. 1. Select and prepare the installation site Site Selection. 2. Assemble the installation tools listed Tools and Parts Required for Installation. 3. Attach the mounting brackets and install the switch in an equipment rack Rack Mounting the Switch. 4. Connect the switch to the power source and network devices Cabling the Modular Switch. 5. Configure the switch Configuring the Modular Switch. Important: Class 1 Laser Product: This product has provisions to install Class 1 laser transceivers that provides optical coupling to the communication network. Once a Class 1 laser product is installed, the equipment is a Class 1 Laser Product. The customer is responsible for selecting and installing the Class 1 laser transceiver and for insuring that the Class 1 AEL (Allowable Emission
Limit) per EN/IEC 60825, CSA E60825-1, and Code of Federal Regulations 21 CFR 1040 is not exceeded after the laser transceiver have been installed. Do not install laser products whose class rating is greater than 1. Refer to all safety instructions that accompanied the transceiver prior to installation. Only Class 1 laser devices certified for use in the country of installation by the cognizant agency are to be utilized in this product. Produit Laser de classe 1: Ce produit a des dispositions pour installer des émetteurs-récepteurs de laser de classe 1 qui offre de couplage au réseau de communication optique.Une fois un produit laser de classe 1 est installé, l'équipement est un produit Laser de classe 1 (Appareil à Laser de Classe 1).Le client est responsable pour sélectionner et installer l'émetteur/récepteur de laser de classe 1 et pour assurer que la classe 1 AEL (limite d'émission admissible) par EN/IEC 60825, CSA E60825-1, et Code des règlements fédéraux 21 CFR 1040 ne soit pas dépassée après avoir installé l'émetteur/récepteur de laser. Ne pas installer des appareils à laser dont la cote de classe est supérieure à 1.Voir toutes les consignes de sécurité qui ont accompagné l'émetteur-récepteur avant l'installation. Seuls appareils laser de classe 1 certifiés pour une utilisation dans le pays d’installation par l’organisme compétent doivent être utilisées dans ce produit. Important: Ultimate disposal of this product should be handled in accordance with all national laws and regulations. L'élimination finale de ce produit doit être effectuée conformément à toutes les lois nationales etrèglements.
1.4 Safety Information
Refer to the Arista Networks document Safety Information and Translated Safety Warnings available at: https://www.arista.com/en/support/product-documentation.
1.5 Obtaining Technical Assistance
Any customer, partner, reseller or distributor holding a valid Arista Service Contract can obtain technical support in any of the following ways:
- Email: support@arista.com. This is the easiest way to create a new service request. Include a detailed description of the problem and the output of “show tech-support”.
- Web: https://www.arista.com/en/support. A support case may be created through the support portal on our website. You may also download the most current software and documentation, as well as view FAQs, Knowledge Base articles, Security Advisories, and Field Notices.
- Phone:+1 866-476-0000 or +1 408-547-5502. Important: No user serviceable parts inside. Refer all servicing to qualified service personnel. Aucune pièce réparable par l'utilisateur à l'intérieur. Confiez toute réparation à un technicien qualifié.
1.6 Specifications
Modular Switch Specifications lists the specifications of Arista Data Center modular switches covered by this guide.
Table 1: Modular Switch Specifications CCS-755 CCS-758 Height 7 RU: 305 mm (12.0 inches)10 RU: 439.4 mm (17.3 inches) Width 441 mm (17.36 inches) maximum 441 mm (17.36 inches) maximum Depth 940 mm (16.5 inches) 940 mm (16.5 inches) Weight 65.4 kg (143.9 lbs) fully loaded91.6 kg (201.5 lbs) fully loaded AC Branch Circuit Protection
20 A 20 A
Input Power Circuits 6 circuits 10 circuits Ambient Temperature Storage Temperature Relative Humidity Altitude to 70°C (-40° to 158°F) 5 to 90% 0 to 3,000 meters (0 to 10,000 feet) to 70°C (-40° to 158°F) 5 to 90% 0 to 3,000 meters (0 to 10,000 feet) Cooling See Power draw configurations in Table 2: 750 Series Power Specifications See Power draw configurations inTable 2: 750 Series Power Specifications The Table 2: 750 Series Power Specifications lists the power specifications of the modular switch components.
Table 2: 750 Series Power Specifications Module Type Part Number Power Draw (Typical / Maximum - non PoE) Available Power (for PoE)1 Supervisor Modules CCS-750-Sup100 CCS-750-Sup25
79 W / 94 W
70 W / 80 W
Linecard Modules CCS-750X-48TP-LC CCS-750X-48ZP-LC CCS-750X-48ZXP-LC CCS-750X-48SX-LC CCS-750X-48THP-LC
42 W / 43 W
83 W / 87 W
148 W / 160 W
82 W / 159 W
101 W / 174 W
Power Supply (AC) PWR-3351-AC-RED 52 W
755 Series System Full chassis loaded with
2 CCS-750-Sup100
2 CCS-755-X3-SC
5 CCS-750X-48ZP
6 PWR-3351-AC-RED
1026 W / 1251 W 18871 W
758 Series System Full chassis loaded with
8 CCS-750X-48ZP
10 PWR-3351-AC-RED
1338 W / 1566 W 31789 W
1 Assumes all PSUs are operating between 220 - 240 V. 2 When no AC input is applied. Note1: Includes typical power supply conversion inefficiency. Contact your local Sales Engineer for 750 power calculator details. Note2: Power numbers given as Typical/Maximum or Typical/Hot/Maximum where Hot is defined as 40°C Sea Level. * Not N+N redundant power at worst case Temp/Elevation.
The following topics are covered in this section:
- Site Selection
- Tools and Parts Required for Installation
- Electrostatic Discharge (ESD) Precautions
2.1 Site Selection
The following criteria should be considered when selecting a site to install the switch.
- Floor Space: Install the switch in an area that provides adequate clearance for removing front and rear components.
- Figure 1: Clearance Requirements and Footprint for Switches displays the dimensions and footprint of the switch clearance requirements for the switches. Figure 2-1: Clearance Requirements and Footprint for Switches Table 3: Clearance Requirements and Footprint Dimensions shows the dimensions for each of the modular switches. Table 3: Clearance Requirements and Footprint Dimensions Clearance Requirements DimensionsSwitch A B C
- Temperature and Ventilation: For proper ventilation, install the switch where there is ample airflow to the front and back of the switch. The temperature should not go below 0° or exceed 40°C.
Important: To prevent the switch from overheating, do not operate it in an area where the ambient temperature exceeds 40°C (104°F). Pour empêcher l'interrupteur de surchauffe, ne pas utiliser il dans une zone où la température ambiante est supérieure à 40°C (104°F).
- Airflow Orientation: The fans direct air from the front panel to the rear panel. Orient the front panel toward the cool aisle.
- Rack Space Requirements: Table 4: Rack Space Requirements shows the rack space requirements for each of the modular switches. Table 4: Rack Space Requirements Rack or Cabinet (standard 19" EIA) Mount KitSwitch 2-post 4-post Switch Height (RU) CCS-755 KIT-CCS-750-2P KIT-CCS-750-4P 7 CCS-758 KIT-CCS-750-2P KIT-CCS-750-4P 10 Note: The accessory kit provides the required mounting hardware for each switch.
- Power Requirements: Arista switches require a minimum number of operating power supplies in all chassis, and for each power domain of switches with multiple power domains. Refer to Cabling the Modular Switch for more details regarding your switch.
- Other Requirements: Select a site where liquids or objects cannot fall onto the equipment and foreign objects are not drawn into the ventilation holes. Verify these guidelines are met:
- Clearance areas to the front and rear panels allow for unrestricted cabling.
- All front and rear panel indicators can be easily read.
- AC power cords can reach from the AC power outlet to the input connectors.
2.2 Tools and Parts Required for Installation
The following tools are required to install a modular switch.
- Mechanical device capable of lifting chassis being installed Table 5: Rack Component Requirements.
- Torque reading nut driver (for DC power supplies).
- #2 Phillips head screwdriver. Rack Mount: Shows the Rack Components Required for each of the Modular Switches. The following table shows the rack components required for each of the modular switches. Table 5: Rack Component Requirements Rack or Cabinet (standard 19" EIA)Switch Rack screws(1) Rack Nuts(2) Notes CCS-755 14 14 2-post installation, 4- post installation CCS-758 18 18 2-post installation, 4- post installation The accessory kit includes screws that fit many common equipment racks.
Rack nuts are only for racks with unthreaded, rack-post holes.
2.3 Electrostatic Discharge (ESD) Precautions
Observe these guidelines to avoid ESD damage when installing or servicing the switch.
- Assemble or disassemble equipment only in a static-free work area.
- Use a conductive work surfaces (such as an anti-static mat) to dissipate static charge.
- Wear an ESD wrist strap to dissipate static charge accumulation.
- Minimize handling of assemblies and components.
- Keep replacement parts in their original static-free packaging.
- Remove all plastic, foam, vinyl, paper, and other static-generating materials from the work area.
- Use tools that do not create ESD.
The following topics are covered in this section:
- Two-post Rack Mount
- Four-post Rack Mount (Optional) The switches can be installed in two-post Two-post Rack Mount or four-post Four-post Rack Mount (Optional) racks. The appropriate accessory kit provides components for installing the switch in the rack. The chassis can be mounted in the following three positions:
- Front
- Center
- Back (rear) Attaching Mounting Brackets to the CCS-755 Two-post and Attaching Mounting Brackets to the CCS-758 for Two-post show examples for attaching mounting ears to the CCS-755 and CCS-758 chassis to support each of the three mounting locations. Note: Four-post rack mount kit is optional. Illustrations in this chapter depict the mounting of a chassis in a single orientation. After completing the instructions for your rack type, proceed to Cabling the Modular Switch.
3.1 Two-post Rack Mount
The switch can be mounted in either forward orientation (line cards and supervisors facing forward) or backward orientation (fans and PSUs facing forward). For each of these orientations, the switch supports a front, center or rear mount into a two-post rack. The accessory kit includes the following two-post mounting parts:
- Two-post rack cradle
- mounting brackets
- 18 screws Note: The following illustrations highlight a front-mount.
3.1.1 Rack Mounting the CCS-755 for Two-post
To mount the switch to the rack, perform the following tasks.
- Attach the mounting brackets to the switch for the desired orientation and position supported Attaching Mounting Brackets to the CCS-755 Two-post.
- Insert and secure the two-post cradle to the rack Attaching Cradle to the Racks for 755 Two-post.
- Insert and secure the switch into the rack Inserting and Securing CCS-755 Chassis into Two-post Rack.
3.1.1.1 Attaching Mounting Brackets to the CCS-755 Two-post
Attach the mounting brackets to both sides of the chassis using the screws provided in the kit for the desired orientation and position. The following figure shows the CCS-755 chassis with the mounting brackets for Forward-Front, Forward-Center, and Backward-Front mounting. Figure 3-1: Attaching the Mounting Brackets for 755
3.1.1.2 Attaching Cradle to the Racks for 755 Two-post
Attach the two-post cradle to the rack using the screws provided as shown in the following figure. Use rack nuts if needed. Figure 3-2: Attaching the Cradle to the Rack
3.1.1.3 Inserting and Securing CCS-755 Chassis into Two-post Rack
- Move the chassis to the rack using a mechanical lift. Note: If modules are inserted in the chassis, use the lift carefully to avoid damaging any components. 2. Lift and slide the chassis into the rack cradle in the desired orientation.
Note: The following figure shows an unthreaded rack example with rack nuts. Figure 3-3: Inserting the Switch into the Two-post Rack (CCS-755 Forward-Front) 3. Secure the chassis to the rack as shown in the following figure. Figure 3-4: Securing the Chassis (CCS-755 Forward-Front) After completing the two-post Installation, proceed to Cabling the Modular Switch.
3.1.2 Rack Mounting the CCS-758 for Two-post
To mount the switch to the rack, perform the following tasks:
- Attach the mounting bracket(s) to the switch for the desired orientation and position supported Attaching Mounting Brackets to the CCS-758 for Two-post.
- Insert and secure the two-post cradle to the rack Attaching Cradle to the Racks for 758 for Two-post.
- Insert and secure the switch into the rack Inserting and Securing CCS-758 Chassis into Rack for Two- post.
3.1.2.1 Attaching Mounting Brackets to the CCS-758 for Two-post
Attach the mounting brackets to both sides of the chassis using the screws provided in the kit for the desired orientation and position. The following figure shows the CCS-758 chassis with the mounting brackets for Forward-Front, Forward-Center, and Backward-Front mounting. Figure 3-5: Attaching the Mounting Brackets for CCS-758
3.1.2.2 Attaching Cradle to the Racks for 758 for Two-post
Attach the two-post cradle to the rack using the screws provided. Use rack nuts if needed. Figure 3-6: Attaching the Cradle to the Rack
3.1.2.3 Inserting and Securing CCS-758 Chassis into Rack for Two-post
- Move the chassis to the rack using a mechanical lift. Note: If modules are inserted in the chassis, use the lift carefully to avoid damaging any components. 2. Lift and slide the chassis into the rack cradle in the desired orientation.
Note: The following figure shows an unthreaded rack example with rack nuts. Figure 3-7: Inserting the Switch into the Two-post Rack (758 Forward-Front) 3. Secure the chassis to the rack as shown in the following figure. Figure 3-8: Securing the Chassis (758 Forward-Front) After completing the two-post Installation, proceed to Cabling the Modular Switch.
3.2 Four-post Rack Mount (Optional)
The switch can be mounted in either forward orientation (line cards and supervisors facing forward) or backward orientation (fans and PSUs facing forward) in a four-post rack.
The accessory kit includes the following four-post mounting parts:
- 4-post rack cradle
- mounting brackets
- 18 screws
3.2.1 Rack Mounting the CCS-755 for Four-post
To mount the switch to the rack, perform the following tasks.
- Attach the mounting brackets to the switch for the desired orientation and position supported Attaching Mounting Brackets to the CCS-755 for Four-post.
- Insert and secure the two-post cradle to the rackAttaching Cradle to the Racks for 755 Two-post .
- Insert and secure the switch into the rack Inserting and Securing the Switch into the Rack for Four-post 755.
3.2.1.1 Attaching Mounting Brackets to the CCS-755 for Four-post
Attach the mounting brackets to both sides of the chassis using the screws provided in the kit for the desired orientation and position. The following figure shows the CCS-755 chassis with the mounting brackets for Forward-Front, Forward-Center, and Backward-Front mounting. Figure 3-9: Attaching the Mounting Brackets for 755 Note: Note Center and rear mount are not supported for four-post rack mounting.
3.2.1.2 Inserting and Securing the Cradle to the Racks for Four Post 755
- Insert two screws loosely in the two front rack posts and two in the back two rack posts at the same level for the figure below. Figure 3-10: Attaching Mounting Screws to the Rack Posts for 755 2. Buckle the straps on the cradle together, prior to installation, so the left and right sides are angled slightly inwards for the figure below. Figure 3-11: Buckling the Straps 3. Pull out the rear sliding rails slightly beyond the back rack posts. 4. Insert the cradle so that the notches in the cradle engage behind the loosely mounted front screws for the figure below.
- Secure the cradle to the rack posts using the remaining screws, and tighten the loosely mounted screws for the figure below. Figure 3-14: Securing the Cradle in the Rack
3.2.1.3 Inserting and Securing the Switch into the Rack for Four-post 755
- Move the chassis to the rack using a mechanical lift. Note: If modules are inserted in the chassis, use the lift carefully to avoid damaging any components. 2. Lift the chassis into the rack and slide it into the cradle for the figure below. Figure 3-15: Inserting the Chassis (755 Forward-Front)
- Secure the chassis by tightening additional screws on the front flanges into the rack posts for the figure below. Figure 3-16: Securing the Chassis (755 Forward-Front) After completing the Four-Post Installation, proceed toCabling the Modular Switch.
3.2.2 Rack Mounting the CCS-758 for Four-post
To mount the switch to the rack, perform the following tasks:
- Attach the mounting bracket(s) to the switch for the desired orientation and position supported Attaching Mounting Brackets to the Four Post CCS-758.
- Insert and secure the two-post cradle to the rackAttaching Cradle to the Racks for 758 for Two-post.
- Insert and secure the switch into the rack Inserting and Securing the Switch into the Four-post Rack 758.
3.2.2.1 Attaching Mounting Brackets to the Four Post CCS-758
Attach the mounting brackets to both sides of the chassis using the screws provided in the kit for the desired orientation and position. The figure below shows the 758 chassis with the mounting brackets for Forward- Front and Backward-Front mounting. Figure 3-17: Attaching the Mounting Brackets for 758 Note: Center mount is not supported for four-post rack mounting.
3.2.2.2 Inserting and Securing the Cradle to the Racks for Four-post 758
To insert and secure the cradle assembly to the rack use the following steps. 1. Insert two screws loosely in the two front rack posts and two in the back two rack posts at the same level. Figure 3-18: Attaching Mounting Screws to the Rack Posts for 758 2. Buckle the straps on the cradle together, prior to installation, so the left and right sides are angled slightly inwards (Figure 20: Buckling the Straps). Figure 3-19: Buckling the Straps 3. Pull out the rear sliding rails slightly beyond the back rack posts. 4. Insert the cradle so that the notches in the cradle engage behind the loosely mounted front screws (Figure 21: Inserting the Cradle).
- Secure the cradle to the rack posts using the remaining screws, and tighten the loosely mounted screws (Figure 23: Securing the Cradle in the Rack). Figure 3-22: Securing the Cradle in the Rack
3.2.2.3 Inserting and Securing the Switch into the Four-post Rack 758
Note: If modules are inserted in the chassis, use the lift carefully to avoid damaging any components. 1. Lift the chassis into the rack and slide it into the cradle. Figure 3-23: Inserting the Chassis (758 Forward-Front)
- Secure the chassis by tightening additional screws on the front flanges into the rack posts (Figure 25: Securing the Chassis (758 Forward-Front)). Figure 3-24: Securing the Chassis (758 Forward-Front) After completing the Four-Post Installation, proceed to Cabling the Modular Switch.
Cabling the Modular Switch The following topics are covered in this section:
- Cabling the Power Supplies
- Cabling Chassis Ground
- Cabling the AC Power Supplies
- Power Supply Specifications
- Power Supply Configurations
- Power Supply Redundancy
- Connecting Supervisor Cables
- Connecting Linecard Modules and Cables
4.1 Cabling the Power Supplies
Before you begin, refer to the Arista Networks document Compliance and Safety Guide available at:https:// www.arista.com/en/support/product-documentation. Important: Power down the switch: Remove all power cords from the power inlets. Mettez le commutateur: Retirez tous les cordons d'alimentation des prises d'alimentation. Important: Installation of this equipment must comply with local and national electrical codes. If necessary, consult with the appropriate regulatory agencies and inspection authorities to ensure compliance. Installation de cet équipement doit être conformes aux codes électriques locaux et nationaux. Si nécessaire, consulter les organismes de réglementation appropriés et des autorités de contrôle pour assurer la conformité. Note: Many configurations will require additional power supplies. Nombreuses configurations exigera des alimentations supplémentaires. Important: Read all installation instructions before connecting the system to the power source. Lire toutes les instructions d'installation avant de brancher le système à la source d'alimentation. Table 7: Power Supply Configurations shows the minimum number of operating power supplies that must be connected to active circuits for each switch to operate. Each power supply includes a fan that maintains proper power supply temperature. The appendices display the location of components for all switches described in this guide.
4.2 Cabling Chassis Ground
Figure 26: Chassis Ground Locations (CCS-755) and Figure 27: Chassis Ground Locations (CCS-758) display the location of the chassis grounding locations on the front panel of the switches. Chassis ground locations are also located on the rear panel of the switch chassis (Rear Panel). After mounting the switch into
Cabling the Modular Switch the rack, connect at least one of the chassis grounds to the data center ground using two-hole ground lugs with 16 mm (5/8 in.) spacing, and two M4 x 0.7 screws. After the switch is grounded, ESD wrist straps can be grounded by connecting them to one of the attach points. Important: Grounding wires and grounding lugs are not supplied. Wire size should meet local and national installation requirements. Commercially available 2 or 4 AWG wire is recommended for installations in the U.S. À la terre et de mise à la terre fils cosses ne sont pas fournis. Calibre des fils doit satisfaire des exigences de l'installation locale et nationale. Disponible dans le commerce 2 ou 4 AWG fil est recommandé pour les installations aux États-Unis. Important: This equipment must be grounded. Never defeat the ground conductor. This unit requires over-current protection. Cet équipement doit être mis à la terre. Ne jamais modifier le conducteur de terre. Cet appareil nécessite de protection contre les surintensités. Important: Secondary Grounding wires, lugs, and screws (M4 x 0.7) are not supplied. Secondaire à la terre, câbles, cosses et vis (M4 x 0.7) ne sont pas fournis. Figure 4-1: Chassis Ground Locations (CCS-755)
1 Grounding locations 3 Line cards
2 ESD attach point 4 Supervisor modules
Figure 4-2: Chassis Ground Locations (CCS-758) To power down the switch, remove all power cords from the power inlets.
4.3 Cabling the AC Power Supplies
The switches use PWR-3351-AC-RED (Figure 28: AC Power Supply (PWR-3351-AC-RED)) AC power supplies. Power cables are included with the accessory kit (Table 23: Accessory Kits for the Modular Switches). To power the switch, connect the cables to the C20 connectors on the PSU inputs, and insert the other side of the cables into the main power providing circuit(s). Note: The power supply, handle color, orientation, etc. may be different in your device from the one shown in Figure 28: AC Power Supply (PWR-3351-AC-RED).
Cabling the Modular Switch Figure 4-3: AC Power Supply (PWR-3351-AC-RED) Rear Panel displays the rear panel location of the power supplies. Note: After disconnection from main power, LED(s) on the PSU remain on for a short period of time. The actual duration varies for each PSU model, but the LED(s) will eventually turn off. The PSU fan will ramp up and run at maximum speed for a few seconds before shutting down.
4.4 Power Supply Specifications
Table 6: Power Supply Specifications (each PSU) shows the power supply specifications for each of the PSUs supported. Table 6: Power Supply Specifications (each PSU) Power Supply Maximum Output Power Rating (DC) Input Voltage and Frequency Maximum Input Current Input Branch Circuit Protection PWR-3351-AC- RED
1400 W 3000 W
16 A 20 A
Important: Each power supply requires input branch circuit protection in compliance with AHJ requirements. Chaque alimentation nécessite une protection du circuit de la branche d’entrée conformément aux exigences de l’AHJ.
4.5 Power Supply Configurations
Table 7: Power Supply Configurations shows the power supply configurations for the modular switches. Note: PSU input voltage for all PSUs in the system must be the same.
Table 7: Power Supply Configurations Modular Switch Recommended Number of PSUs (for redundancy) Minimum Number of PSUs Required Maximum Number of PSUs Supported CCS-755 3 1 6 CCS-758 5 1 10
4.5.1 Recommendations for Power Supply Usage
- Use separate circuits (A & B) with required protection for each power supply.
- Use the same PSU model when replacing a failed PSU. Any suitable alternative must be approved before using if the original model is no longer supported or available.
- Unless your switch allows for mixing power supplies, do not mix power supply types.
- Populate the PSU slots sequentially.
- Valid redundancy configurations for each domain are described in Power Supply Redundancy section.
4.6 Power Supply Redundancy
Important: Installation of this equipment must comply with local and national electrical codes. If necessary, consult with the appropriate regulatory agencies and inspection authorities to ensure compliance. Installation de cet équipement doit être conformes aux codes électriques locaux et nationaux. Si nécessaire, consulter les organismes de réglementation appropriés et des autorités de contrôle pour assurer la conformité. Important: Read all installation instructions before connecting the system to the power source. Lire toutes les instructions d'installation avant de brancher le système à la source d'alimentation. Most installations will have redundant, dual, independent power feeds. Each independent power feed will be referenced as A and B. The recommended installation is to wire each supply to independent power feed (A or B). Each power supply includes a fan that maintains proper power supply temperature. The following appendices display the location of the following component on all switches described in this guide. Front Panel displays the front panel location of the supervisor modules and line cards. Rear Panel displays the rear panel location of switch card modules (not visible), fans, and PSUs. Important: This unit requires over-current protection. Cet appareil nécessite de protection contre les surintensités. Important: Unused slots must be occupied or covered with a blank to ensure proper airflow through the chassis. Les emplacements inutilisés doivent être occupés ou recouvert d'un blanc pour assurer la bonne circulation d'air dans le châssis.
Cabling the Modular Switch
4.7 Connecting Supervisor Cables
Supervisor modules contain console, management, and USB ports. Figure 29: Supervisor CCS-750-SUP100 display port and status LED locations on the supervisors. Refer to the chassis specification in Connecting Supervisor Cables for additional information about the serial port. Figure 4-4: Supervisor CCS-750-SUP100
1 Supervisor status LED 5 Switch card status LED 9 SFP and RJ-45 Ethernet
2 Supervisor active status LED6 Fan status LED 10 RJ-45 Serial management
3 PSU status LED 7 Uplink status LED 11 USB Port
4 Linecard status LED 8 Supervisor/Uplink ports (2x QSFP100)12 Release
Figure 4-5: Supervisor CCS-750-SUP25
4 Linecard status LED 8 Supervisor/Uplink ports (4x SFP25)12 Release
- Console (Serial) Port: Connect to a PC with RJ-45 to DB-9 serial adapter cable. Default switch settings include:
- 9600 baud
- No flow control
- 1 stop bit
- No parity bits
- 8 data bits The supervisor cards must be installed in one of the two slots designated for them. They are shown in Front Panel for the switches.
Table 8: RJ-45 tp DB-9 Connections RJ-45 DB-9 RJ-45 DB-9 RTS 1 8 CTS GND 5 5 GND DTR 2 6 DSR RXD 6 3 TXD TXD 3 2 RXD DSR 7 4 DTR GND 4 5 GND CTS 8 7 RTS
- Ethernet management port: Connect to 10/100/1000 management network with RJ-45 cable.
- USB Port: May be used for software or configuration updates.
- Uplink Port: Use the relevant optics for connection.
4.8 Connecting Linecard Modules and Cables
Install required SFP, SFP+, QSFP+, QSFP100, OSFP, and QSFP-DD optic modules in linecard module ports Figure 31: SFP or SFP+ Ports . Figure 4-6: SFP or SFP+ Ports Connect cables as required to linecard module ports. Supervisor and linecard module ejectors on the front of the chassis assist with cable management. CAUTION : Excessive bending can damage interface cables, especially optical cables. Flexion excessive peut endommager les câbles d'interface, en particulier les câbles optiques. Note: You must ensure that any open slots for modules, supervisors, linecards, etc. are covered by the appropriate “blank” plates. Check with your local Arista Networks representative if you have questions.
Configuring the Modular Switch Arista switches ship from the factory in Zero Touch Provisioning (ZTP) mode. ZTP configures the switch without user intervention by downloading a startup configuration file or a boot script from a location specified by a DHCP server. To manually configure a switch, ZTP is bypassed. The initial configuration provides one username (admin) accessible only through the console port because it has no password. When bypassing ZTP, initial switch access requires logging in as admin, with no password, through the console port. Then you can configure an admin password and other password protected usernames. This manual configuration procedure cancels ZTP mode, logs into the switch, assigns a password to admin, assigns an IP address to the management port, and defines a default route to a network gateway. 1. Provide power to the switch Cabling the Modular Switch. 2. Connect the console port to a PC. As the switch boots without a startup-config file, it displays this message through the console: The device is in Zero Touch Provisioning mode and is attempting to download the startup-config from a remote system. The device will not be fully functional until either a valid startup-config is downloaded from a remote system or Zero Touch Provisioning is cancelled. To cancel Zero Touch Provisioning, login as admin and type 'zerotouch cancel' at the CLI. localhost login: 3. Log into the switch by typing admin at the login prompt. localhost login:admin 4. Cancel ZTP mode by typing zerotouch cancel. IMPORTANT: This step initiates a switch reboot. localhost>zerotouch cancel 5. After the switch boots, log into the switch again by typing admin at the login prompt. Arista EOS localhost login:admin Last login: Fri Mar 15 13:17:13 on console 6. Enter global configuration mode. localhost>enablelocalhost#config 7. Assign a password to the admin username with the username secret command. localhost(config)#username admin secret pxq123 8. Configure a default route to the network gateway. localhost(config)#interface management 1/1 localhost(config-if-Ma1/1)#ip address 192.0.2.8/24
- Save the configuration by typing write memory or copy running-config startup-config . localhost#copy running-config startup-config 11. When the management port IP address is configured, use this command to access the switch from a host, using the address configured in Step 9. ssh admin@192.0.2.8 Refer to the Arista Networks User Manual for complete switch configuration information.
The following topics are covered in this section:
- Supervisor Module
- Linecard Module Indicators
- Switchcard Module Status Indicators
- Fan Module Status Indicators
- Power Supply Status Indicators A.1 Supervisor Module While the front panel of each switch can house two supervisors, switch operations require only one. Supervisors display switch status and contain Ethernet management and console ports. The supervisor provides:
- one serial console port.
- two Ethernet management ports (one RJ-45, one optical).
- one USB port.
- two QSFP100 (CCS-750-SUP100) or four SFP25 (CCS-750-SUP25) supervisor/uplink ports.
- several system level status indicator LEDs Status Indicators. A.1.1 System Level Status Indicator LEDs: CCS-750-SUP100 The system status indicator LEDs are shown in Figure 32: Supervisor CCS-750-SUP100 and Figure 33: Supervisor CCS-750-SUP25 . Figure A-1: Supervisor CCS-750-SUP100
1 Supervisor status LED 5 Switch card status LED 9 Ethernet management ports
2 Supervisor active status LED6 Fan status LED 10 RJ-45 Serial console port
4 Linecard status LED 8 QSFP100 uplink ports 12 Release/locking mechanism
(Right)1 1 There is a similar mechanism on the left.
Figure A-2: Supervisor CCS-750-SUP25
4 Linecard status LED 8 SFP25 uplink ports 12 Release/locking mechanism1
1 There is a similar mechanism on the left. A.1.2 Supervisor Status LEDs Behavior Note: LED behavior is described for the active supervisor, except where noted. A.1.2.1 Supervisor Status LED Table 9: Supervisor Status LED States interprets the states of the supervisor status LED. s for both the active and the redundant supervisor module. Table 9: Supervisor Status LED States State Status Off Supervisor has no power or is powering up. Blinking Green Supervisor is booting. System can take up to 30 minutes to come up. All other LEDs will also be off. Green Supervisor is operating normally (master supervisor). System is good. Yellow/Amber/Orange System is overheating or has been disabled by software. Blinking Blue Locater function enabled by CLI (Beacon). A.1.2.2 Supervisor Active Status LED Table 10: Supervisor Active Status LED States interprets the states of the supervisor active status LED.
Table 10: Supervisor Active Status LED States State Status Off Supervisor is the standby supervisor. All other LEDs except Supervisor Status remain off. Green Supervisor is the Active supervisor. A.1.2.3 PSU Status LED Table 11: PSU Status LED States interprets the states of the PSU status LED. Table 11: PSU Status LED States State Status Off PSU not detected, installed or powered. Green All installed PSUs are operating normally. Red One or more PSU has a fault. A.1.2.4 Linecard Status LED Table 12: Linecard Status LED States interprets the states of the Linecard status LED. Table 12: Linecard Status LED States State Status Off Linecard not detected, installed or powered. Green All installed linecards are operating normally. Yellow/Amber/Orange One or more linecard is booting up or being updated. Red One or more linecards have failed. A.1.2.5 Switchcard Status LED Table 13: Switchcard Status LED States interprets the states of the switchcard status LED.
Table 13: Switchcard Status LED States State Status Off Switchcard not detected, installed or powered. Green All installed switchcards are operating normally. Yellow/Amber/Orange One or more switchcard is booting up or being updated. Red One or more switchcards have failed. A.1.2.6 Fan Status LED Table 14: Fan Status LED States interprets the states of the Fan status LED. Table 14: Fan Status LED States State Status Off No fan detected. Green All installed fans are operating normally. Yellow/Amber/Orange One or more fans has failed or is missing. Red Fans are insufficient or incompatible. A.1.2.7 Management Ethernet Port Status LED Table 15: Management Ethernet Port Status LED States interprets the states of the management Ethernet port status LED. Table 15: Management Ethernet Port Status LED States LED State Status Left Off Port is not linked up. Left Green Port is linked up. Right Off Port has no activity. Right Green Port has activity. A.1.2.8 Uplink Status LED Table 16: Uplink Status LED States interprets the states of the uplink status LED.
Table 16: Uplink Status LED States State Status Off Supervisor is not powered up or inserted. Green Uplink card is operating normally. Yellow/Amber/Orange Uplink card is booting up or being updated. Red Uplink card power has failed. Note: Uplink and supervisor are on independent power domains so one can be up while the other is down. A.2 Linecard Module Indicators Each linecard module provides one status LED plus LEDs for each port on the card.Figure 34: Linecard Module Status LEDs shows a representative line card. The figures in Linecards indicate the location of the LEDs on each linecard. Figure A-3: Linecard Module Status LEDs
1 Linecard module status LED 2 Port status LED
A.2.1 Linecard Module Status LEDs Behavior Table 17: Linecard Module Status LED States interprets the states of the linecard module status LED located on the individual linecard.
A.2.1.1 Linecard Module Status LED Table 17: Linecard Module Status LED States State Status Off Linecard not inserted or powered. Green Linecard operating normally. Yellow/Amber/Orange Linecard is booting up or being updated. Blinking Red Locater function is enabled (Beacon). Red Linecard has failed. Table 18: Port Status LED States interprets the states of the port status LED located by each port on the linecard. Table 18: Port Status LED States State Status Off Port link is down. Green Port link is up. Yellow/Amber/Orange Port is being administered by software. Blinking Yellow/Amber/OrangeLocater function is enabled (Beacon).
A.3 Switchcard Module Status Indicators Rear Panel displays the position of the Switchcard Module Status LEDs on the rear of each switch. Figure 35: 755 Switchcard Module and Fan Module Status LEDs displays fan module status and switch card module status LEDs on the 755 switch. Figure A-4: 755 Switchcard Module and Fan Module Status LEDs
1 Fan module 1 status LED 4 Switchcard release 7 Switchcard release
2 Fan module 1 5 Switchcard module status LED
3 Fan module 1 release 6 Switchcard module active status LED
758 Switchcard Module and Fan Module Status LEDs displays fan module status and switchcard module
status LEDs on the 758 switch. Figure A-5: 758 Switchcard Module and Fan Module Status LEDs
A.3.1 Switchcard Module Status LEDs Behavior There are two LEDs for the Switchcard status. Only one of the switch cards is active. The second provides redundancy. The switchcard module LEDs are on the rear panel of the switches. Note: LED behavior is described for the active Switchcard, except where noted. A.3.1.1 Switchcard Module Status LED Switchcard Module Status LED States interprets the states of the switchcard module status LED. Table 19: Switchcard Module Status LED States State Status Off Switchcard does not have power. Green All installed switchcards are working normally. Yellow/Amber/Orange Switchcard is booting up or being updated. Red One or more switchcards have failed. A.3.1.2 Switchcard Module Active Status LED Switchcard Module Active Status LED States interprets the states of the switchcard module active status LED. Table 20: Switchcard Module Active Status LED States State Status Off Switchcard is in standby mode. Green Switchcard is in active mode.
A.4 Fan Module Status Indicators The fan module status LED are on the fan modules.Figure 37: Fan Module Status LED displays the LED on the fan module. Figure A-6: Fan Module Status LED
1 Release
2 Fan module status LED
Note: Bezel color indicates airflow direction. Table 21: Fan Module Status LED States interprets the states of the switch card module active status LED. Table 21: Fan Module Status LED States State Status Off Fan does not have power. Green Fan module is working normally. Flashing red Locater function is enabled (Beacon). Red Fan module has failed.
A.5 Power Supply Status Indicators The power supply status LED ison the power supply modules.Figure 38: AC Power Supply (PWR-3351-AC- RED) displays the LED on the PWR-3351-AC-RED AC power supply. Figure A-7: AC Power Supply (PWR-3351-AC-RED)
1 Status LED
2 Handle
3 Release
Note: Handle color indicates airflow direction. Table 22: AC Power Supply Status LED States interprets the AC power supply module LED status indicators with multiple PSU present in the system. Table 22: AC Power Supply Status LED States State Status Off No AC Input or 140V < AC < 175V - single PSU. Blinking Amber1 No AC Input or 140V < AC < 175V – multiple PSUs. Blinking Green1 Standby Mode. Green Normal Operation. Amber PSU module has failed. Blinking Amber and Green2 Boot Loader. 1 1 second ON, 1 second OFF. 2 1 second ON, alternating.
The following topics are covered in this section:
- Parts Used in All Rack Mount Configurations
- Two-Post Rack Mount Parts
- Four-Post Rack Mount Parts (Optional)
- Four-Post (Extended Depth) Rack Mount Parts (Optional) Each switch has an accessory kit that contains parts required to install the switch.Table 23: Accessory Kits for the Modular Switches provides further details on the accessory kit for each switch. The following sections in the chapter list the installation parts provided by the accessory kit in more details. Table 23: Accessory Kits for the Modular Switches 755 758 Common cables and accessories Included Included Two-post rack mount kit (KIT- CCS-750 Included Included Four-post rack mount kit (KIT- CCS-750-4P) Optional Optional Four-post rack mount kit (KIT- CCS-750-4PL) Optional Optional Optional Power Cords Warning: All provided power cables are for use only with Arista products. Câbles d’alimentation doivent être utilisés uniquement avec des produits de Arista.
B.1 Parts Used in All Rack Mount Configurations B.1.1 Cables Table 24: Cables Provided in Accessory Kit Quantity Description
1 RJ45 To DB9 Adapter with a
6-foot rolled cable.
1 Seven-foot RJ45 Patch
panel cable. B.1.2 Getting-Started Booklet One 2-page document. B.2 Two-Post Rack Mount Parts The following sections list the parts provided in the accessory kit for two-post rack mount installations. Table 25: Two-Post Rack Mount Parts Quantity Description 1 Cradle assembly.
4 Mounting brackets/ears
(flange).
16 Rack mounting screws and
16 Flat-head screws
Figure B-1: Two-Post Rack Mount Parts
1 Mounting brackets/ears 3 Rack mounting screws and rack nuts
2 Cradle assembly
Note: There may be extra parts after a CCS-755 installation. B.3 Four-Post Rack Mount Parts (Optional) The following sections list the parts provided in the accessory kit for four-post rack mount installations. Table 26: Four-Post Rack Mount Parts Quantity Description 1 Cradle assembly. (flange).
20 Rack mounting screws and
Figure B-2: Four-Post Rack Mount Parts B.4 Four-Post (Extended Depth) Rack Mount Parts (Optional) The following sections list the parts provided in the accessory kit for four-post rack mount installations. Table 27: Four-Post Rack Mount Parts Quantity Description 1 Cradle assembly. (flange).
Figure B-3: Four-Post Rack Mount Parts
This appendix displays the front panel of all switches covered by this guide. Figure C-1: CCS-755 Front Panel (Fully Populated)
1 Grounding locations 3 Linecards
Figure C-2: CCS-758 Front Panel (Fully Populated)
This appendix displays the rear panel of all switches covered by this guide. Figure D-1: CCS-755 Rear Panel (Fully Populated)
1 Chassis ground 6 Fans and switchcard module 2 11 ESD attachment point
2 PSUs (1, 3, 5 - From top) 7 Switchcard ejector - SC2 12 Switchcard ejector - SC2
3 Fans and switchcard module 1 8 Ejector latch - SC2 13 Ejector latch - SC2
4 Switchcard ejector - SC1 9 PSUs (2, 4, 6 - From top) 14 Switchcard ejector - SC1
5 Ejector latch - SC1 10 Chassis ground 15 Ejector latch - SC1
Figure D-2: CCS-758 Rear Panel (Fully Populated)
2 PSUs (1, 3, 5, 7, 9 - From top)7 Switchcard ejector - SC2 12 Switchcard ejector - SC2
4 Switchcard ejector - SC1 9 PSUs (2, 4, 6, 8, 10 - From top)14 Switchcard ejector - SC1
This appendix displays the linecards supported by modular switches covered by this guide. Figure E-1: CCS-750X-48ZXP-LC
1 Linecard status LED 3 Port numbers
2 Port status LED
Note: Ports 5 to 16, 21 to 32, and 37 to 48 are 100M-capable ports. Figure E-2: CCS-750X-48TP-LC/ CCS-750X-48THP-LC Figure E-3: CCS-750X-48ZP-LC
Figure E-4: CCS-750X-48SX-LC
Maintenance and Field Replacement The following topics are covered in this section:
- Power Supplies
- Fan Module
- Supervisor Module
- Linecards
- Switchcards This appendix describes the process for replacing switch components. You must ensure that at least one of the secondary grounding pads located on the front panel of the chassis is connected to the data center ground. While working on the switches, use grounded, anti-static wrist straps connected to one of the attach points on the switch for grounding yourself and preventing ESD damage to the switch. Note: Illustrations in this appendix are examples for a representative switch and component(s). Procedures must be applied to component(s) supported by the specific device. You must use component(s) and the appropriate slots for those component(s) when replacing or adding them. F.1 Power Supplies The switches support AC Power supplies which must be ordered separately. The following steps are required for ESD protection when adding or replacing power supplies. Note: For the exact locations of power supplies and grounding for your device, refer to Front Panel and Rear Panel. 1. Ensure that the switch is grounded. Connect at least one of the chassis grounding pads located on the front and rear panels of the chassis to the data center ground as needed. 2. Ground yourself using a connected, anti-static wrist strap. The anti-static ESD wrist strap must be connected to one of the attach points on the switch. 3. Remove the power supply to be replaced (Removing AC Power Supply) or use an empty slot. Note: For the power supplies supported by your device, refer to Table 2: 750 Series Power Specifications. If the PSU has a cable release latch, use it for securing and removing the power cord as needed. F.1.1 Removing AC Power Supply Perform the following steps to remove an AC power supply. 1. Put on a grounded, anti-static ESD strap. 2. Unplug the cable from the PSU. 3. Squeeze the latch release. 4. Remove the power supply from the switch using the power supply latch release and handle.
Maintenance and Field Replacement F.1.2 Installing AC Power Supply You must make space for installing the power supply by removing an existing one (Removing AC Power Supply) or use an available slot on the switch. Perform the following steps to install an AC power supply. 1. Put on a grounded, anti-static ESD strap. 2. Unpack the new power supply. 3. Insert the new power supply into the empty power supply slot. 4. After you insert the power supply, push gently on the power supply until the power supply is fully seated. 5. Connect the power cord to the power supply. 6. Connect to the power source. 7. Verify normal operation using the LED indicators for your switch Table 11: PSU Status LED States. F.2 Fan Module The fan modules are hot-swappable and N + 1 redundant. They are accessible from the rear of the switch (Rear Panel). You must take into account that the module you are inserting is compatible with the switch and the module that you are replacing. Perform the following steps to remove and replace a fan module. F.2.1 Removing Fan Module 1. Put on a grounded, anti-static ESD strap. 2. Use the release lever to unseat the fan module. 3. Use the handle to pull out the fan module. F.2.2 Installing Fan Module You must make space for installing the module by removing an existing one (Removing Fan Module) from a fan module slot available on the switch. Perform the following steps to install the module. 1. Put on a grounded, anti-static ESD strap. 2. Unpack the module to be installed. 3. Slide the fan module into the slot until it is completely seated. 4. Verify that the module is operating normally (Table 14: Fan Status LED States). 5. Use the show environment cooling command to further verify normal operation. F.3 Supervisor Module The supervisor modules are hot-swappable. They are accessible from the front of the switch. You must take into account that the module you are inserting is compatible with the switch and the module that you are replacing. Use the following procedure to remove and replace a supervisor module. For the supervisor module locations for your device, refer to Front Panel. F.3.1 Removing Supervisor Module Perform the following steps to remove the module. 1. Put on a grounded ESD strap. 2. Use the release handles on the Supervisor card to unseat it. 3. Slide supervisor module out of the slot.
F.3.2 Removing Supervisor Module Blank The supervisor module blank has plastic latches. 1. Put on a grounded, anti-static ESD strap. 2. Grip the plastic handles to release the latch and remove the blank from the supervisor module slot you are going to populate. You may want to save the blank for future use as needed. The blank is needed for the switch to operate normally if a supervisor module slot is not populated. F.3.3 Installing Supervisor Module You must make space for installing the module by removing an existing one (Removing Supervisor Module) or removing a blank (Removing Supervisor Module Blank) from a supervisor module slot available on the switch. Perform the following steps to install the module. 1. Put on a grounded, anti-static ESD strap. 2. Unpack the supervisor module to be installed. 3. Slide supervisor module into slot until it is completely seated. 4. Verify that the module is operating normally (Table 9: Supervisor Status LED States). F.4 Linecards The linecards are hot-swappable. They are accessible from the front of the switch. You must take into account that the linecard you are inserting is compatible with the switch and the linecard that you are replacing. Use the following procedure to remove and replace a linecard. If you are adding a new linecard, remove the blank from the linecard slot and install the new linecard. For the linecard locations on your
Maintenance and Field Replacement switch, refer to Front Panel. Figure 50: CCS-75x Linecard Install shows linecards with the seating or ejector mechanisms along with some fully seated linecards. Figure F-1: CCS-75x Linecard Install
1 Linecard 3 Ejector lever (linecard seated correctly)
2 Ejector mechanism (lever and handle)4 Ejector lever (linecard not seated)
F.4.1 Removing a Linecard Perform the following steps to remove a linecard. 1. Put on a grounded, anti-static ESD strap. 2. Move the left and right handle outwards until the ejector lever releases the linecard. 3. Slide the linecard out using care as the linecard could be heavy. F.4.2 Removing Linecard Blank The linecard blank has plastic latches. 1. Put on a grounded, anti-static ESD strap. 2. Grip the plastic handles to release the latch and remove the blank from the linecard slot you are going to populate. You may want to save the blank for future use as needed. The blank is needed for the switch to operate normally if a linecard slot is not populated. F.4.3 Installing a Linecard You must make space for installing the linecard by removing an existing one (Removing Linecard) or removing a blank (Removing Linecard Blank) from a linecard slot available on the switch.
- Put on a grounded, anti-static ESD strap. 2. Unpack the linecard to be installed. 3. Slide the linecard into the slot until the ejection lever goes inside the chassis and push gently until the linecard is seated completely. 4. Verify that the linecard is operating normally (Table 12: Linecard Status LED States). Note: The ejector handle is perpendicular to the face when correctly installed. F.5 Switchcards The switchcards are hot-swappable and 1 + 1 redundant. They are accessible from the rear of the switch (Rear Panel). You must take into account that the switchcard you are inserting is compatible with the switch and the switchcard that you are replacing. Use the following procedure to remove and replace a switchcard. For the switchcard locations on your switch, refer to Rear Panel. F.5.1 Removing Switchcard Perform the following steps to remove a switchcard. 1. Put on a grounded, anti-static ESD strap. 2. Use the release handles of the switchcard to unseat it. 3. Pull the switchcard out gently once released. Note: When the switchcard and fan assembly is removed, a metal cover swings into place (Figure 51: 758 Rear View with One Switchcard Installed). Figure F-2: 758 Rear View with One Switchcard Installed
1 SC2 cover
Maintenance and Field Replacement F.5.2 Installing Switchcard You must make space for installing the switchcard by removing an existing one from a switchcard slot available on the switch unless an open slot is available. 1. Put on a grounded, anti-static ESD strap. 2. Unpack the switchcard to be installed. 3. Slide the switchcard into the slot until it is completely seated. 4. Verify that the switchcard is operating normally (Table 13: Switchcard Status LED States). Figure 52: 758 Switchcard Installation shows switchcard installation. The switchcard on the right is fully seated with the latch closed. Figure F-3: 758 Switchcard Installation
1 Switchcard 3 Ejector (switchcard not seated)
2 Ejector mechanism (handle and latch) 4 Ejector latch (closed)
This appendix lists the Regulatory Model Numbers (RMNs), where applicable, for the product models for the switches described in this document. Table 28: Regulatory Model Numbers and Product Numbers Regulatory Model Number (RMN) Product Number(s) CCS-755 CCS-755 CCS-758 CCS-758
This appendix provides Taiwan RoHS information for switches covered by this guide. For Taiwan BSMI RoHS Table, go to https://www.arista.com/assets/data/pdf/AristaBSMIRoHS.pdf.