Datasheet sections

  • 1.1 Scope
  • 1.2 Receiving and Inspecting the Equipment
  • 1.3 Installation Process
  • 1.4 Safety Information
  • 1.5 Obtaining Technical Assistance
  • 1.6 Specifications
  • 2.1 Site Selection
  • 2.2 Tools Required for Installation
  • 2.3 Electrostatic Discharge (ESD) Precautions
  • 3.1 Shelf Installation
  • 3.2 Mounting Ears Installation
  • 3.3 Switch Insertion into the Rack
  • 4.1 Cabling the AC Power Supply
  • 4.1.1 Grounding the Switch
  • 4.1.2 Connecting the Power Cables to an AC Power Supply
  • 4.2 DC Power Supplies
  • 4.2.1 Wire and Lug Preparation
  • 4.2.2 Connecting a DC Power Supply to Power Source
  • 5.1 Connecting the Supervisor Cables
  • 5.2 Connecting the Linecard Modules and Cables

Modular Data Center Switch DCS-7358X4 DCS-7368X4 DCS-7289R3A Arista.com Arista Networks PDOC-00150-02

Headquarters Support Sales

5453 Great America Parkway

Santa Clara, CA 95054 USA +1-866-476-0000 +1-408-547-5501 +1-866-497-0000 www.arista.com/en/ support@arista.com sales@arista.com © Copyright 2024 Arista Networks, Inc. All rights reserved. The information contained herein is subject to change without notice. The trademarks, logos, and service marks ("Marks") displayed in this documentation are the property of Arista Networks in the United States and other countries. Use of the Marks is subject to the Arista Networks Terms of Use Policy, available at www.arista.com/en/terms-of-use. Use of marks belonging to other parties is for informational purposes only.

This section discusses the following topics:

  • Scope
  • Receiving and Inspecting the Equipment
  • Installation Process
  • Safety Information
  • Obtaining Technical Assistance
  • Specifications

1.1 Scope

This guide is intended for properly trained service personnel and technicians who need to install the following Arista Networks Data Center Switches:

  • DCS-7358X4
  • DCS-7368X4
  • DCS-7289R3A Important: Only qualified personnel should install, service, or replace this equipment. Seul le personnel qualifié doit installer, service, ou remplacer cet équipement.

1.2 Receiving and Inspecting the Equipment

Upon receiving the switch, inspect the shipping boxes and record any external damage. Retain packing materials if you suspect that part of the shipment is damaged; the carrier may need to inspect them. If the boxes were not damaged in transit, unpack them carefully. Ensure you do not discard any accessories in the same box as the main unit. Inspect the packing list and confirm that you received all listed items. Compare the packing list with your purchase order. The Parts List provides a list of components included with the switch.

1.3 Installation Process

Complete the following required tasks to install and use the switch: 1. Select and prepare the installation site (Site Selection). 2. Assemble the installation tools listed (Tools Required for Installation). 3. Attach the mounting brackets and install the switch in an equipment rack (Rack Mounting the Switch).

  1. Connect the switch to the power source and network devices (Powering the Modular Switch and Connecting Serial and Management Cables). 5. Configure the switch (Configuring the Switch). Important: Class 1 Laser Product: This product has provisions for installing Class 1 laser transceivers that provide optical coupling to the communication network. After a Class 1 laser product is installed, the equipment is a Class 1 Laser Product. The customer is responsible for selecting and installing the Class 1 laser transceiver and for ensuring that the Class 1 AEL (Allowable Emission Limit) per EN/IEC 6-825, CSA E60825-1, and Code of Federal Regulations 21 CFR 1040 are not exceeded after the laser transceiver has been installed. Do not install laser products whose class rating is greater than 1. Refer to all safety instructions that accompany the transceiver before installation. Only Class 1 laser devices certified for use in the country of installation by the cognizant agency are to be utilized in this product. Produit laser de classe 1: Ce produit est prévu pour l'installation d'émetteurs-récepteurs laser de classe 1 qui assurent un couplage optique au réseau de communication. Une fois qu’un produit laser de classe 1 est installé, l’équipement devient un produit laser de classe 1. Le client est responsable de la sélection et de l'installation de l'émetteur-récepteur laser de classe 1 et de s'assurer que les AEL de classe 1 (limite d'émission admissible) selon EN/IEC 6-825, CSA E60825-1 et Code of Federal Regulators 21 CFR 1040 ne sont pas dépassées. après l'installation de l'émetteur-récepteur laser. N'installez pas de produits laser dont la classe est supérieure à 1. Reportez-vous à toutes les instructions de sécurité qui accompagnent l'émetteur-récepteur avant l'installation. Seuls les appareils laser de classe 1 certifiés pour une utilisation dans le pays d'installation par l'agence compétente doivent être utilisés dans ce produit. Important: Ultimate disposal of this product must be handled in accordance with all national laws and regulations. L'élimination finale de ce produit doit être effectuée conformément à toutes les lois nationales etrèglements. The switch card module requires special handling when removing, inserting, or handling the component. The Maintenance and Field Replacement section provides instructions for handing switchcard modules.

1.4 Safety Information

Refer to the Arista Networks document Safety Information and Translated Safety Warnings at https:// www.arista.com/en/support/product-documentation.

1.5 Obtaining Technical Assistance

Any customer, partner, reseller, or distributor holding a valid Arista Service Contract can obtain technical support in any of the following ways:

  • Email: http://support@arista.com. This is the easiest way to create a new service request. Include a detailed description of the problem and the “show tech-support” output.
  • Web: https://www.arista.com/en/support.

Create a support case through the support portal on our website. You may also download the most current software and documentation and view FAQs, Knowledge Base articles, Security Advisories, and Field Notices.

  • Phone: +1 866-476-0000 or +1 408-547-5502. Important: No userserviceable parts inside. Refer all servicing to qualified service personnel. Aucune pièce réparable par l'utilisateur à l'intérieur. Confiez tous les services à un personnel de service qualifié.

1.6 Specifications

The following table lists the specifications of Arista Data Center modular switches and components this guide covers.

Table 1: Modular Switch Specifications DCS-7358X4 DCS-7368X4 DCS-7289R3A Height 4 RU: 179 mm (7.0 inches)

4 RU: 179 mm

(7.0 inches) (7.0 inches) Width 442 mm (17.4 inches) 442 mm (17.4 inches) 442 mm (17.4 inches) Depth Without handles and ejectors 559 mm (22.0 inches) 559 mm (22.0 inches) 688 mm (27.1 inches) With handles and ejectors 640 mm (25.2 inches) 640 mm (25.2 inches) 767 mm (30.2 inches) Weight Empty 13.6 kg (30.0 lbs) 13.6 kg (30.0 lbs) 13.6 kg (30.0 lbs) Fully Loaded 38.6 kg (85 lbs) 38.6 kg (85 lbs) 43.5 kg (96.0 lbs) AC Power Input (per circuit) 200 - 240 VAC, 16 A, 50 or 60 Hz 200 - 240 VAC, 16 A, 50 or 60 Hz 200 - 240 VAC, 16 A, 50 or 60 Hz Branch Circuit Protection (per circuit)20 A 20 A 20 A DC Power Input (per circuit) -40 V to -72V, 44 A (-48V) -40 V to -72V, 44 A (-48V) -40 V to -72V, 44 A (-48V) Branch Circuit Protection (per circuit)50 A 50 A 50 A Input Power Circuits (AC or DC) 2 to 4 2 to 4 2 to 4 Operating Temperature 0° to 40°C (32° to 104°F) 0° to 40°C (32° to 104°F) 0° to 40°C (32° to 104°F) Storage Temperature -40° to 70°C (-40° to 158°F) -40° to 70°C (-40° to 158°F) -40° to 70°C (-40° to 158°F) Operating Altitude 0 to 3,000 meters (0 to 10,000 feet) 0 to 3,000 meters (0 to 10,000 feet) 0 to 3,000 meters (0 to 10,000 feet) Relative Humidity 5 to 90% 5 to 90% 5 to 90%

The following table lists the power specifications of the DCS-7358X4 and DCS-7368X4 modular switch components. Table 2: DCS-7358X4, DCS-7368X4 Modular Switch and Component Power Specifications Module Type Part Number Power Draw: Typical / Maximum Supervisor Modules DCS-7368-SUP DCS-7368-SUP-D

30 W / 48 W

Linecard Modules DCS-7368-16C DCS-7368-4P DCS-7368-4D DCS-7368-16S DCS-7358-16C

63 W(1) / 140 W(2)

72 W(1) / 140 W(2)

36 W(1) / 88 W(2)

83 W(1) / 140 W(2)

Switchcard Module (excluding fans)DCS-7358X4-SC DCS-7368X4-SC

215 W / 385 W

204 W / 364 W

Power Supplies PWR-1900-AC 34 W / 57 W DCS-7358X4 Series System Full chassis loaded with 1 - DCS-7368-SUP-D supervisor 1 - DCS-7358X4-SC switch card 8 - DCS-7368-16C line cards 5 - Fans 2 - PWR-1900-AC power supplies

821 W(1) / 1547 W(2)

DCS-7368X4 Series System Full chassis loaded with 1 - DCS-7368-SUP-D supervisor 1 - DCS-7368X4-SC switch card 8 - DCS-7358-16C line cards 5 - Fans 2 - PWR-1900-AC power supplies

810 W(1) / 1528 W(2)

(1): Excluding optics. (2): With 4.5 W optics.

The following table lists the power specifications of the DCS-7289R3A modular switch components. Table 3: DCS-7289R3A Modular Switch and Component Power Specifications Module Type Part Number Power Draw: Typical / Maximum Supervisor Modules DCS-7289-SUP-D 40 W / 63 W Linecard Modules DCS-7358-16C DCS-7368-4P DCS-7368-4D DCS-7368-16S DCS-7368-16C Switchcard Module (excluding fans)DCS-7289R3A-SC DCS-7289R3AK-SC DCS-7289R3AM-SC

650 W / 950 W

Power Supplies PWR-1900-AC 34 W / 57 W DCS-7289R3A Series System Full chassis loaded with 1 - DCS-7289-SUP-D supervisor 1 - DCS-7289R3A-SC switch card 9 - DCS-7368-16C-LC line cards 5 - Fans 2 - PWR-1900-AC power supplies

1244 W / 1927 W

(1): Excluding optics. (2): With 4.5 W optics. Note: DCS-7289R3A Modular Switch supports only Front to Rear airflow.

This section discusses the following topics:

  • Site Selection
  • Tools Required for Installation
  • Electrostatic Discharge (ESD) Precautions

2.1 Site Selection

Consider the following criteria when selecting a site to install the switch: Floor Space: Install the switch in an area that provides adequate clearance for removing front and rear components. The following figure displays switch clearance requirements. Figure 2-1: Switch Component Removal Footprint The following table shows the clearance dimensions for the modular switches. Table 4: Clearance Requirements and Footprint Dimensions Clearance Requirements DimensionsSwitch A B C DCS-7358X4 25.4 cm (10 inches) 64.0 cm (25.2 inches) 55.9 cm (22.0 inches) DCS-7368X4 25.4 cm (10 inches) 64.0 cm (25.2 inches) 55.9 cm (22.0 inches) DCS-7289R3A 25.4 cm (10 inches) 76.7 cm (30.2 inches) 66.0 cm (26.0 inches)

  • Temperature and Ventilation: For proper ventilation, install the switch with ample airflow to the front and back of the switch. The temperature should not go below 0° or exceed 40°C. Important: To prevent the switch from overheating, do not operate it in an area where the ambient temperature exceeds 40°C (104°F). Pour empêcher l'interrupteur de surchauffe, ne pas utiliser il dans une zone où la température ambiante est supérieure à 40°C (104°F).
  • Airflow Orientation: Determine the airflow direction of the fan modules and power supply modules. Fan and power supply module handles indicate airflow direction. Note: Your switch configuration may not support all power supplies. The Rear Panels display power supply and fan module locations on the rear panel. Verify the airflow direction of all modules (all rear panel modules have the same color handles). Orient the switch to ensure the air intake modules face the cool aisle. Contact your sales representative if the airflow direction is incompatible with the installation site.
  • Rack Space: Install the switch in a 19" rack or cabinet. The switch height depends on the switch model, as specified in Table 1: Modular Switch Specifications. Verify that the removal clearances (Table 4: Clearance Requirements and Footprint Dimensions ) provide adequate space for the power and data cables that connect to the switch. When mounting the switch in a partially filled rack, load the rack from bottom to top, with the heaviest equipment at the bottom. Load the switch at the bottom if it is the only item in the rack. The accessory kit provides mounting brackets for four-post racks. Two-post mounting racks are not supported.
  • Power Requirements: Power requirements vary by switch. Refer to Table 2: DCS-7358X4, DCS-7368X4 Modular Switch and Component Power Specifications, and Table 3: DCS-7289R3A Modular Switch and Component Power Specifications for information regarding your specific system. Multiple circuits provide redundancy protection. The switch uses power cables that have an IEC-320 C19 plug. The accessory kit provides IEC-320 C19 to C20 power cables. Important: All power input plug-socket combinations must be accessible at all times; they provide the primary method of disconnecting power from the system. Toutes les combinaisons de fiche-prise d’entrée de puissance doivent être accessibles en tout temps; ils fournissent le principal moyen de coupure d’alimentation du système.
  • Other Requirements: Select a site where liquids or objects cannot fall onto the equipment and foreign objects are not drawn into the ventilation holes. Verify these guidelines are met:
  • Clearance areas to the front and rear panels allow for unrestricted cabling.
  • All front and rear panel indicators can be easily read.
  • AC power cords can reach from the AC power outlet to the connectors on the rear panel. Important: Disconnecting power to all input sockets is required to turn off the unit completely. La déconnexion de l'alimentation de toutes les prises d'entrée est nécessaire pour éteindre complètement l'appareil.

2.2 Tools Required for Installation

Each switch provides an accessory kit that contains parts for installing the switch into a four-post rack. Two- post rack mount parts are available through your sales representative. Accessory kits do not include screws, nuts, or bolts for attaching the switch to a conventional rack. In addition to the accessory kit, the following tools are required to install a modular switch: All Racks A mechanical device capable of lifting an installed chassis (the chassis weight is listed in the Table 1: Modular Switch Specifications). Four-Post Tool-less Rack No additional equipment is required. Four-Post Conventional Rack

  • Screws or rack mounting nuts and bolts.
  • Screwdriver.

2.3 Electrostatic Discharge (ESD) Precautions

Observe these guidelines to avoid ESD damage when installing or servicing the switch.

  • Assemble or disassemble equipment only in a static-free work area.
  • Select a conductive work surface (such as an antistatic mat) to dissipate static charge.
  • Wear an ESD wrist strap to dissipate static charge accumulation.
  • Minimize handling of assemblies and components.
  • Keep replacement parts in their original static-free packaging.
  • Remove all plastic, foam, vinyl, paper, and other static-generating materials from the work area.
  • Select tools that do not create ESD.

Mount the switch only in a four-post rack. Complete the following tasks to mount the switch.

  • Attach the left and right shelves to the rack, adjusting the length of the shelves as needed. You must allocate 4RU rack space starting from the top of the shelf for switch placement (Shelf Installation).
  • Attach the rack mounting ears to the switch (Mounting Ears Installation).
  • Use a forklift to insert and secure the switch into the rack (Switch Insertion into the Rack). Note: Components are designed for tool-less installation in square-hole racks.

3.1 Shelf Installation

The four-post mount accessory kit contains these components:

  • The left and right shelves
  • Rack mounting ears Follow the steps below to attach the shelves to the rack. 1. Extend the sliding end of each shelf so that it can be placed on the rack. Figure 3-1: Attaching Shelves to the Rack (Right Shelf Shown) 2. Move the sliding end of each shelf so that the shelf fits snugly and level onto the rack, and secure the shelves using the screws to the rack.

Figure 3-2: Adjusting Shelves to Fit onto the Rack (Right Shelf Shown) Note: You must ensure that the shelves are installed at the same level in the rack. The installed switch shelves are shown in the following figure. Figure 3-3: Switch Shelves Installed

3.2 Mounting Ears Installation

The following figure displays the rack mounting ears, which secure the switch top to the rack. Attach the two rack mounting ears to each side of the switch. The inner side of each ear may include a latch to the locking mechanism that secures the ear to the rack. The two rack mounting ears are identical and will attach to the switch such that the securing screws are on the outside of the switch, as shown.

Figure 3-4: Rack Mounting Ears

3.3 Switch Insertion into the Rack

Use a forklift to raise and align the switch with the installed shelves, insert the rollers on the rack, and mount the ears into the shelves' channels. Push and slide the switch into the rack to secure it. Note: The rack mounting ears use only the top two rack units, but you must allocate four rack units from the top of the shelves for the switch. Figure 3-5: Inserting the Switch

Figure 3-6: Securing the Switch After completing the Four-Post Installation, proceed to Powering the Modular Switch.

Powering the Modular Switch Important: Installation of this equipment must comply with local and national electrical codes. Consult with the appropriate regulatory agencies and inspection authorities to ensure compliance if necessary. L'installation de cet équipement doit être conforme aux codes électriques locaux et nationaux. Consultez les agences de réglementation et les autorités d'inspection appropriées pour garantir la conformité si nécessaire. Note: Arista modular switches take 15 to 30 minutes to boot completely. The switch operates with multiple power supplies. Refer to Table 1: Modular Switch Specifications for information regarding your specific system. Table 2: DCS-7358X4, DCS-7368X4 Modular Switch and Component Power Specifications, and Table 3: DCS-7289R3A Modular Switch and Component Power Specifications list the quantities of modules each chassis can contain and the minimum operating requirements for each model. Table 5: Power Supply Capacity and Requirements for DCS-7358X4, DCS-7368X4, and DCS-7289R3A Series Modular Switches Switch Model Chassis Capacity (Power Supply Units) Minimum Operating Requirements (non- redundant power) DCS-7358X4 4 1 active circuit DCS-7368X4 4 1 active circuit DCS-7289R3A (1) 4 1 active circuit (1): Some configurations could require more than one active circuit. Rear Panels displays the location of the power supplies on the switch. This chapter includes sections that describe the procedure for grounding and cabling power supplies. After completing the instructions for your switch, proceed to Connecting Serial and Management Cables. Important: Read all installation instructions before connecting the system to the power source. Lire toutes les instructions d'installation avant de brancher le système à la source d'alimentation.

  • Non-Redundant Configuration: Provide power to the minimum required power inputs.
  • Redundant Power Supply Configuration: Connecting power to modules over minimum requirements protects the switch against failed modules and can provide grid-level redundancy.
  • Power down the Switch: Remove all power cords from the power input sockets. Important:

Powering the Modular Switch This equipment must be grounded. Never defeat the ground conductor. This unit requires over-current protection. Cet équipement doit être mis à la terre. Ne jamais modifier le conducteur de terre. Cet appareil nécessite de protection contre les surintensités.

4.1 Cabling the AC Power Supply

4.1.1 Grounding the Switch

After mounting the switch into the rack, connect the switch to the data center ground. The grounding pads are located on the rear of the switch. It would help if you used a right-angle ground lug to attach the chassis ground wire and route it to the data center ground, as shown in the following figure. Figure 4-1: Grounding the Switch Important: Grounding wires and grounding lugs (M4 x 0.7) are not supplied. Wire size should meet local and national installation requirements. Commercially available 6 AWG wire is recommended for installations in the U.S. À la terre et de mise à la terre fils cosses (M4 x 0.7) ne sont pas fournis. Calibre des fils doit satisfaire des exigences de l’installation locale et nationale. Disponible dans le commerce des câbles 6 AWG sont recommandé pour les installations aux États-Unis. After the switch is grounded, ESD wrist straps can be grounded by connecting them to the ESD port on either the rear or the front of the switch, as shown in the following figures.

Figure 4-2: ESD Sockets (Rear)

1 Switch Card Module Release Handle 6 PSU Status LED

2 Fan 7 PSU

3 Fan Release Handle 8 PSU Release Handle

4 Fan Installation Indicator 9 Ground

5 Fan Status LED 10 ESD

Figure 4-3: ESD Sockets (Front)

1 Supervisor Module 3 Linecard Ejector Latch

2 Supervisor Ejector Latch 4 ESD

4.1.2 Connecting the Power Cables to an AC Power Supply

The following figure displays an AC power supply module, including the power input socket.

Powering the Modular Switch Figure 4-4: AC Power Supply

1 Power Supply Status LED

The power supplies require power cables that comply with an IEC-320 C19 plug. The accessory kit provides 14 AWG, C19, to C20 power cables. To insert a power cable: 1. Pull the retaining clip back on each power input socket. Note: The retaining clip is optional (if provided). 2. Plug the power cables into the sockets. 3. Adjust the retaining clips for your power cords (if a retaining clip was provided). 4. Push the retaining clip back down over the cable (if a retaining clip was provided).

4.2 DC Power Supplies

The following figure displays a DC power supply module. Figure 4-5: DC Power Supply Important: A disconnect device must be provided as part of the installation. Un dispositif de sectionnement doit être fourni dans le cadre de l'installation. Important:

Ensure power is removed from DC circuits before performing any installation actions. Locate the disconnect device, circuit breakers, or fuses on DC power lines servicing the circuits. Turn off the power line circuits or remove the fuses. Pouvoir assurer qu'il est retiré de circuits DC avant d'effectuer des actions d'installation . Localiser les disjoncteurs ou des fusibles sur les lignes de courant continu desservant les circuits. Coupez les circuits de lignes d'alimentation ou retirer les fusibles. Important: Wire size must comply with local and national requirements and electrical codes. Use only copper wire. Le calibre du fil doit être conforme aux exigences locales et nationales et les codes électriques. Utiliser du fil de cuivre. Important: Apply ground connection to the switch first during installation and remove last when removing power. Appliquer connexion à la terre à l'interrupteur premier lors de l'installation et de supprimer la dernière alimentation lors du débranchement.

4.2.1 Wire and Lug Preparation

Before installing, remove power from DC circuits by turning off the power line servicing the circuits. Prepare the stranded wiring before you begin a DC power installation. Note: Stranded copper wiring is required and should meet local and national installation requirements. Wires and grounding lugs are not supplied. 1. Attach an ESD grounding strap. 2. Prepare the stranded copper wiring for the power supply to be used. The following table provides wiring, lug, and tightening torque information for the power supplies covered in this guide. Table 6: Wiring, Lug, and Tightening Torques for DC PSUs Wire Size (1) Tightening TorquePSU (AWG) (mm 2 ) Lug Type (2) N • m in. • lbs. PWR-1900-DC 4 - 6 21.2 - 13.3 dual-hole 2.7 24 1 Unless otherwise noted, wire size applies to -48V, Battery return, and Protective earth wires. 2 Unless otherwise noted, twin #10 studs spaced for dual-hole lug with 5/8" hole spacing. 3. Strip the wires to the appropriate length for the lugs to be used. 4. Select agency-approved compression (pressure) lugs for wiring terminations. 5. Slip on heat-shrink tubing on the wire ends before assembling the lugs onto the wire. 6. Crimp the lugs with the proper tool, and ensure that the tubing extends over the barrel of the lugs and the insulation on the wires. The following figure shows an example lug.

Powering the Modular Switch Figure 4-6: Lug Preparation

1 Insulated wire A 1/4”

2 Heat-shrink tubing B 1/2”

3 Lug C 5/8”

  1. Shrink the tubing with a heat gun.

4.2.2 Connecting a DC Power Supply to Power Source

To connect a DC power supply to a power source, perform the following: 1. Prepare the stranded wiring (Wire and Lug Preparation). 2. Attach the appropriate lugs to the source DC wires. 3. Connect the DC-input wires to the appropriate terminals using the specified torque (Table 6: Wiring, Lug, and Tightening Torques for DC PSUs) in the following order. Note: Remove terminal covers as needed. a. Ground wire to the Protective Earth (PE ) terminal. b. Negative source DC cable to the negative (- / -48V) terminal. c. Positive (+) source DC cable to the positive (+ / Rtn) terminal. 4. Replace the terminal covers as required. Figure 4-7: DC PSU Connection Example

Connecting Serial and Management Cables This section discusses the following topics:

  • Connecting the Supervisor Cables
  • Connecting the Linecard Modules and Cables

5.1 Connecting the Supervisor Cables

The supervisor module contains the console, management, and USB ports. The following figure displays port locations on the DCS-7368-SUP-D switch supervisor card. Figure 5-1: Supervisor Ports

1 Console Port (Serial) 2 USB Port 3 Ethernet Management Ports

  • Console (Serial) Port: Connect to a PC with RJ-45 to DB-9 serial adapter cable. Default switch settings include:
  • 9600 baud
  • No flow control
  • 1 stop bit
  • No parity bits
  • 8 data bits
  • Ethernet management port: Connect to 10/100/1000 management network with RJ-45 cable.
  • Ethernet management port (optical): Connect to 1 Gbit management network with SFP connector module and cable.

Connecting Serial and Management Cables Figure 5-2: SFP Port Module Insertion Connect cables as required to line card module ports. Supervisor and line card module ejectors on the front of the chassis assist with cable management. Important: Excessive bending can damage interface cables, especially optical cables. Flexion excessive peut endommager les câbles d'interface, en particulier les câbles optiques.

  • USB Port: This may be used for software or configuration updates.

5.2 Connecting the Linecard Modules and Cables

Install required QSFP28, QSFP-DD, and OSFP optic modules in linecard module ports. Note: In some devices, adjacent QSFP ports may require you to rotate the module for insertion. Figure 5-3: Optical Module Insertion Note: For more information about supported optical transceivers, refer to https://www.arista.com/assets/data/pdf/Transceiver-Guide.pdf. Warning: Excessive bending can damage interface cables, especially optical cables.

Arista switches ship from the factory in Zero Touch Provisioning (ZTP) mode. ZTP configures the switch without user intervention by downloading a startup configuration file or a boot script from a location specified by a DHCP server. To manually configure a switch, ZTP is bypassed. The initial configuration provides one username (admin) that is accessible only through the console port because it has no password. When bypassing ZTP, initial switch access requires logging in as admin with no password through the console port. Then, you can configure an admin password and other password-protected usernames. This manual configuration procedure cancels ZTP mode, logs into the switch, assigns a password to the admin, assigns an IP address to the management port, and defines a default route to a network gateway. 1. Provide power to the switch (Powering the Modular Switch). 2. Connect the console port to a PC (Connecting Serial and Management Cables). As the switch boots without a startup-config file, it displays this message through the console: The device is in Zero Touch Provisioning mode and is attempting to download the startup-config from a remote system. The device will not be fully functional until either a valid startup-config is downloaded from a remote system or Zero Touch Provisioning is cancelled. To cancel Zero Touch Provisioning, login as admin and type 'zerotouch cancel' at the CLI. localhost login: 3. Log into the switch by typing admin at the login prompt. localhost login: admin 4. Cancel ZTP mode by typing zerotouch cancel. IMPORTANT: This step initiates a switch reboot. localhost> zerotouch cancel 5. After the switch boots, log into the switch again by typing admin at the login prompt. Arista EOS localhost login: admin Last login: Fri Mar 15 13:17:13 on console 6. Enter global configuration mode. localhost> enable localhost# config 7. Assign a password to the admin username using the username secret command. localhost(config)# username admin secret pxq123 8. Configure a default route to the network gateway. localhost(config)# interface management 1/1

localhost(config-if-Ma1/1)# ip address 192.0.2.8/24 10. Save the configuration by typing write memory or copy running-config startup-config. localhost# copy running-config startup-config 11. When the management port IP address is configured, use this command to access the switch from a host using the address configured in Step 9. ssh admin@192.0.2.8 Refer to the Arista Networks User Manual for complete switch configuration information.

This section discusses the following topics:

  • Supervisor Module
  • Line Card Module Indicators
  • Fan Module Status Indicators
  • Power Supply Status Indicators A.1 Supervisor Module The supervisor displays the switch component status and contains Ethernet management and console ports. The Front Panels display the supervisor's location on the switches. The supervisor provides one serial console port, two Ethernet management ports (one RJ-45, one optical), and one USB port. Four LEDs on the top edge report system status, fan status, power status, and switch module status. The following figure shows the LED status of the supervisor module. Figure A-1: Supervisor Module Status LEDs

1 System Status LED 3 Power Supply Status LED

2 Fan Status LED 4 Switch Card Status LED

The following table interprets the states of the LED indicators on the supervisor module. When indicating error conditions, refer to LEDs on the specified components to determine the condition’s source.

Table 7: Supervisor LED States (1) LED Name LED State Module State Green All powered modules are operating normally.Power Supply Red At least one module has failed. Green All linecards are operating normally.System Red At least one linecard has failed. Green Module is operating normally.Switch Card Red Module has failed. Amber At least one fan is missing or has failed. Green All modules are operating normally. Fan Red Additional functional fans need to be installed on the switch. 1 If all Status LEDs are OFF, check the following: power feeds are live, power supplies are installed, the Switchcard is properly seated, and The supervisor is properly seated. The system will only power up if all four conditions are valid. A.2 Line Card Module Indicators Each line card module provides one status LED plus LEDs for each port on the card. The figures in Linecards indicate the location of the LEDs on each line card. The following figure displays the status LED and Port LEDs on the DCS-7368-16C line card. Arrows indicate the port status being displayed by the corresponding port status LED. Figure A-2: Linecard Status LEDs (DCS-7368-16C)

1 Linecard Port LEDs 2 Linecard Status LED 3 Linecard Ejector Latch

The Line Card Status LED is in the center of the DCS-7368-16C. The following table interprets the states of the Status LED. Table 8: Linecard Status LED States LED State Status Off Line card not inserted. Green Line card operating normally. Amber Line card administratively shut down. Red Line card has failed. The following table interprets the port LED states. Table 9: Linecard Port LED States LED State Status Off The port link is down. Green Port link is up. Yellow Port is disabled in the software. A.3 Fan Module Status Indicators The fan modules are inserted into the switch card module. Each switch contains one switch card and five fan modules. Rear Panels displays the rear panel of the switch. The following figure displays the fan module indicator. The fan handle color indicates the airflow direction. All fan modules must have the same color handle. Note: The orientation of the fan module as inserted in the switch may be different from the one shown. Figure A-3: Fan Status LEDs

1 Fan Release Handle 2 Fan Installation Indicator 3 Fan Status LED

The fan installation Indicator is green when the fan module is properly installed or red when the module is not fully installed. The following table interprets the states of the Fan Status LED.

Table 10: Fan Status LED States LED State Status Off The module is inserted but not receiving power – it may not be properly seated. Green The module is operating normally. Red The module has failed. A.4 Power Supply Status Indicators Power Supply LEDs are on power supply modules. The rear panel contains power supply modules for all switches. The Rear Panels display the position of these LEDs on each switch. The following figure displays a power supply module. The power supply handle indicates the power supply fan direction. Verify that the airflow direction of all modules has the same color handles. Figure A-4: Power Supply The following table interprets the state of the Power Supply Status LED. Table 11: Power Supply Status LED Status Green Power Supply module operating normally. Off No AC power to the module. Red Module has faulted. Blinking Green PSU has AC power but hasn't been enabled by the system - indicates that either the power supply or the Switch Module isn't fully inserted.

Each switch provides an accessory kit containing the parts required to install the switch into a four-post rack. The following sections list the installation parts provided by the accessory kit. This section discusses the following topics:

  • Parts Used in All Configurations
  • Four-Post Rack Mount Parts B.1 Parts Used in All Configurations Quantity Description One for each AC power supply module supplied with switch Power cables: 14 AWG, C19-C20 One RJ-45 Patch Panel Cable, 2 meters. One RJ-45 to DB9 Adapter Cable, 2 meters. Warning: All provided power cables are for use only with Arista products. B.2 Four-Post Rack Mount Parts Quantity Description

2 Mounting Ears

1 Left shelf. 1 Right shelf.

Figure B-1: Four-Post Rack Mount Parts

1 Left Shelf 2 Right Shelf

This section displays the front panel of all switches this guide covers. DCS-7358X4 and DCS-7368X4 Front Panel (fully populated) DCS-7289R3A Front Panel (fully populated)

This section displays the rear panel of all switches this guide covers. Rear Panel with Two PSUs

3 Fan Module Release Lever 8 PSU Release Handle

This section displays the Linecards supported by modular switches this guide covers. DCS-7368-4D

1 Port numbers

2 Linecard Status LED

3 Linecard Ejector Latch

4 Port Status LED

DCS-7358-16C and DCS-7368-16C

Maintenance and Field Replacement This section discusses the following topics:

  • Switchcard Module
  • Power Supplies
  • Fan Modules
  • Supervisor Module
  • Linecards
  • Optical Transceivers Note: Follow ESD protection protocols while handling switch components during maintenance operations. F.1 Switchcard Module The switchcard module is accessible from the rear of the switch, as shown in Rear Panels. Refer to the following figure for more details on removing and replacing the switchcard module. Figure F-1: Switchcard Module Maintenance

1 Switchcard Release Handle 2 Switchcard Release Lever

The module includes lock levers that secure it to the chassis. The module and the lock levers are easily damaged by improperly removing, inserting, or handling. Use caution while lifting or moving the module after removing it from the chassis. F.1.1 Removing the Switchcard Module Follow the steps below to remove the switchcard module from the chassis. 1. Ground yourself with an ESD wrist strap. 2. Move the release handle down. 3. Pinch the release levers towards the center to unlock the module from the chassis. 4. Carefully remove the switchcard module from the chassis while supporting it.

F.1.2 Inserting the Switchcard Module The module insertion process is the inverse of the removal procedure. Follow the steps listed below to insert the switchcard module into a chassis. 1. Align the switchcard module with the rails in the chassis for insertion. 2. Slide the module gently into the chassis until you feel a little resistance. The switchcard module will extend outside the chassis. 3. Pinch the release levers towards the center and push the module until it is flush with the chassis. Let go of the release levers. 4. Try moving the module out gently without engaging the release levers. The module will not move if it is seated correctly. 5. Return the release handle to its locked position (up). Note: Descriptions for removing and replacing power supplies and fans are for a representative power supply or fan. Locations of status indicator LEDs may differ. Refer to your device's front and rear panel illustrations to locate the appropriate LED. F.2 Power Supplies The power supplies are accessible from the rear of the switch, as shown in Rear Panels. Refer to Removing a Power Supply for more details on removing and replacing a power supply unit. The following steps are required when removing power supplies from a switch. F.2.1 Removing a Power Supply 1. Ground yourself with an ESD wrist strap. 2. Power down the power supply, which will be removed by disconnecting the AC power cable. 3. Push the power supply release handle and remove the power supply, as shown in the following figure. Figure F-2: Power Supply Removal

1 PSU Release Handle

Maintenance and Field Replacement F.2.2 Installing a Power Supply You must make space for installing the power supply by removing an existing one (Removing a Power Supply). 1. Remove the replacement power supply from its packaging. 2. Slide the new power supply into the empty slot. 3. Slide the new power supply into the switch until the power supply is fully seated, and the release handle snaps into place. 4. Connect the power cord to the power supply. 5. Verify the LED(s) on the power supply. Note: The Power Supply status LED should be a steady green for normal operation. 6. Verify the new power supply operation by issuing the show environment power command. switch# show environment power The command output will list the power supplies in operation and should include the one you replaced. F.3 Fan Modules The fan modules are accessible from the rear of the switch, as shown in Rear Panels. F.3.1 Removing a Fan Module The following steps are required when removing or replacing fans from a switch. 1. Ground yourself with an ESD wrist strap. 2. Push the fan module release lever and slide the fan module out of the switch, as shown in the following figure. Figure F-3: Fan Module Removal

1 Fan Module Release Lever

F.3.2 Installing a Fan Module You must make space for installing the fan module by removing an existing one (Removing a Fan Module). 1. Remove the replacement fan from its packaging. 2. Slide the new fan module into the switch until the module is fully seated, and the release lever snaps into place. The fan installation indicator will be green installed and seated correctly. 3. Verify that the fan module is working normally. Note: The fan module status LED should be a steady green for normal operation. F.4 Supervisor Module The supervisor module is accessible from the front of the switch, as shown in Front Panels. Refer to the following figure for more details on removing and replacing a supervisor module. Note: Supervisors are hot-swappable. The switch will reboot when the replacement supervisor powers up. Figure F-4: Supervisor Module Maintenance F.4.1 Removing a Supervisor Module Perform the following steps to remove the module. 1. Put on a grounded ESD strap. 2. Lift the supervisor module ejector latch and move the latch down to release the supervisor module. 3. Gently remove the supervisor module by pulling it outwards. F.4.2 Installing a Supervisor Module You must make space for installing the module by removing an existing one (Removing Supervisor Module). Perform the following steps to install the module. 1. Put on a grounded, anti-static ESD strap. 2. Unpack the supervisor module to be installed. 3. Slide the supervisor module into the slot. 4. Raise the ejector handle and latch it into place.

Maintenance and Field Replacement 5. Verify that the module is operating normally. F.5 Linecards The linecards are accessible from the front of the switch, as shown on Front Panels. The linecards are hot- swappable. It would help to consider that the linecard you are inserting is compatible with the switch and the linecard you are replacing. Refer to the following figure for more details on removing and replacing a linecard module. Figure F-5: Linecard Module Maintenance F.5.1 Removing a Linecard Perform the following steps to remove a linecard. 1. Put on a grounded, anti-static ESD strap. 2. Use the ejector handle or lever in the middle of the linecard to release it from the chassis. 3. Slide the linecard gently out of the slot. F.5.2 Installing a Linecard You must make space for installing the linecard by removing an existing one (Removing Linecard) from a linecard slot available on the switch. 1. Put on a grounded, anti-static ESD strap. 2. Unpack the linecard to be installed. 3. Slide the linecard gently into the slot. 4. Use the ejector handle of the linecard to seat the linecard into the chassis. 5. Verify that the linecard is operating normally (Table 8: Linecard Status LED States). F.6 Optical Transceivers For more information about supported optical transceivers and how to remove or install them, refer to https:// www.arista.com/assets/data/pdf/Transceiver-Guide.pdf.

This section lists the Regulatory Model Numbers (RMNs), where applicable, for the product models for the switches described in this document. Note: For modular switches, the RMN applies to allowable configurations for switches in the switch family referenced by the Product Number(s). Table 12: Regulatory Model Numbers and Product Numbers Regulatory Model Number (RMN) Product Number(s) AN1722 DCS-7358X4, DCS-7368X4, DCS-7289R3A

This section provides the Taiwan RoHS information for switches this guide covers. : https://www.arista.com/assets/data/pdf/AristaBSMIRoHS.pdf.