19K101-102L5 ROSENBERGER | Alldatasheet
Document overview
- Manufacturer or author: Provided By ALLDATASHEET.COM(FREE DATASHEET DOWNLOAD SITE)
- PDF pages: 2
Technical content
SMP STRAIGHT JACK 19K101-102L5 Rosenberger Hochfrequenztechnik GmbH & Co. KG Tel.: +49 8684 18-0 Page P.O.Box 1260 D-84526 Tittmoning Germany www.rosenberger.de email: info@rosenberger.de 1 / 2 RF_35/12.04/3.0 All dimensions are in mm; tolerances acc. ISO 2768 m-H Interface According to MIL-STD-348 Documents Assembly instruction 59 G2 Material and plating Connector parts Material Plating Center contact CuBe AuroDur®, gold plated Outer contact CuBe AuroDur®, gold plated Dielectric PTFE Crimping ferrule Copper Gold, 0.1 µm
SMP STRAIGHT JACK 19K101-102L5 Rosenberger Hochfrequenztechnik GmbH & Co. KG Tel.: +49 8684 18-0 Page P.O.Box 1260 D-84526 Tittmoning Germany www.rosenberger.de email: info@rosenberger.de 2 / 2 RF_35/12.04/3.0 f(GHz) Electrical data Impedance 50 Ω Frequency DC to 26.5 GHz Return loss ≥ 20 dB, DC to 12 GHz Insertion loss ≤ 0.05 x dB, DC to 12 GHz Insulation resistance ≥ 5 G Ω Center contact resistance ≤ 6.0 m Ω Outer contact resistance ≤ 2.0 m Ω Test voltage 500 V rms Working voltage 335 V rms Contact Current 1.2A DC max. - Limitations are possible due to the used cable type – Mechanical data Mating cycles if mating part is smooth bore ≥ 1000 if mating part is limited detent ≥ 500 if mating part is full detent ≥ 100 Center contact captivation ≥ 7 N Engagement force - smooth bore 9 N max. - limited detent 45 N max. - full detent 68 N max. Disengagement force - smooth bore 2.2 N min. - limited detent 9 N min. - full detent 22 N min. Environmental data Temperature range -65°C to +155°C Thermal shock MIL-STD-202, Method 107, Condition B Vibration MIL-STD-202, Method 204, Condition B Shock MIL-STD-202, Method 213, Condition A Moisture resistance MIL-STD-202, Method 106 RoHS compliant Tooling Crimping tool 11W150-000 Crimp insert 11W150-402 Suitable cables RG 316 /U, RG 174 A/U, RG 188 A/U Weight Weight 1.0 g/pce Draft Date Approved Date Rev. Engineering change n umber Name Date While the information has been carefully compiled to the best of our knowledge, nothing is intended as representation or warr anty on our part and no statement herein shall be construed as recommendation to infringe existing patents. In the eff ort to improve our products, we reserve the right to make changes judged to be necessary.